![Xantrex ACCB Owner'S Manual Download Page 35](http://html1.mh-extra.com/html/xantrex/accb/accb_owners-manual_3176465035.webp)
Wiring for Off-Grid Applications using an AC Distribution Panel and an Internal Generator Disconnect
975-0046-01-01
1–23
To make the ground connections:
1. Prepare the primary system ground and connect it to the ground bar in
the main AC distribution panel. See the Sine Wave Plus Inverter/
Charger Owner’s Manual for information regarding preparing the
primary system ground.
2. Route cable(s) (hot, neutral, and ground) from the AC distribution
panel through one of the knockouts prepared in the
ACCB
and
connect the ground wire (green) to the ground bar in the
ACCB
.
3. Connect the factory-installed ground wire (green) in the
ACCB
to the
AC ground bar in the inverter.
4. Prepare the cabling from the generator. Route cable(s) (hot, neutral,
and ground) from the generator into one of the knockouts prepared in
the
ACCB
. Connect the ground wire (green) from the generator to the
ground bar in the
ACCB
.
Figure 1-19
Ground Connections for an Off-Grid Application with an AC Distribution Panel and
an Internal Generator Disconnect Breaker
3
2
1
4
Summary of Contents for ACCB
Page 1: ...Sine Wave Plus AC Conduit Box ACCB Owner s Guide Owner s Guide ACCB...
Page 2: ......
Page 3: ...Sine Wave Plus AC Conduit Box ACCB Installation Guide...
Page 54: ...1 42...
Page 65: ......