Maintenance, cleaning, disposal, spare parts
23
9 Screw the WP 25 membrane head on the shaft. Hold
the probe inclined. Excess electrolyte solution is
pressed out at the vent.
10 The filling should be free of air bubbles. Small air
bubbles do not interfere.
Vent (upper part)