![WTI PLS-345 User Manual Download Page 39](http://html1.mh-extra.com/html/wti/pls-345/pls-345_user-manual_1000480039.webp)
7.
Operation
The PLS-345 offers three different methods for switching
A/B paths:
1.
Manual A/B Switching:
The manual A/B Switches on the
PLS front panel are used to initiate switching of one or
more A/B Circuits.
2.
Code Activated A/B Switching:
ASCII commands are
sent to the PLS to initiate switching of one or more
A/B Circuits.
3.
Automated A/B Switching (Monitor Mode):
The PLS
monitors a signal received via the Monitor Input Port, and
switches one or more A/B Circuits according to
user-defined parameters.
These methods are discussed in the sections that follow.
7.1. Manual A/B Switching
The most basic method for switching A/B paths is accomplished
using the manual A/B switches on the PLS front panel. When
performing Manual A/B switching, note the following:
·
The Master A/B Switch (Labeled "All") can be used to
switch all three A/B Circuits.
·
When an A/B Circuit is switched, the corresponding LED
indicators on the instrument front panel and back panel will
light.
7-1
Summary of Contents for PLS-345
Page 1: ...WTI Part No 13236 Rev A PLS 345 Physical Layer Switch User s Guide...
Page 2: ......
Page 12: ...2 4 PLS 345 Physical Layer Switch User s Guide...
Page 38: ...6 4 PLS 345 Physical Layer Switch User s Guide...
Page 61: ......