![WT WTD 002 Instruction Manual Download Page 7](http://html1.mh-extra.com/html/wt/wtd-002/wtd-002_instruction-manual_1000382007.webp)
OPERATION PROCEDURES
Step 1.
Figure 1
Step 2.
Mount the Drilling Handle at the back of the drilling machine.
(See Figure 2)
Figure 2
Place and Mount the Transfer Pan onto the drilling machine by using the
Locking Screw. (See Figure 1)
Place the suitable pair of Clamping Heads on the Pearl Clamp to fit the
Pearls for drilling.
Install and mount the Ground Bit Insert # on the Drilling Chuck by use of
the Chuck Key.
Step 3.
Step 4.