Page 61
6.5
Pump Lifting.
The Revolution pump has been designed with 4 Metric threaded locations on
each side of the gearbox for lifting the pump.
Note
1) These lifting point have been designed to carry the weight of the pump only, if
the pump has been installed / mounted these lifting point cannot be used.
2) On lifting two certified lifting eyes must be used in conjunction with a correctly
rated lifting sling
Horizontal Port
Vertical Ports
Lifting Points
Lifting Points
WARNING
Summary of Contents for Revolution R0150X
Page 1: ...Installation Operation and Maintenance Manual for the Frame 6 7 ...
Page 54: ...Page 54 Rear Front 6 0 Specifications 6 1 Clearance Chart Radial Radial Hub Hub ...
Page 55: ...Page 55 Revolution CPP 808 ALLOY ...
Page 63: ...Page 63 ...
Page 68: ...Page 68 7 0 Service History Pump Model Pump Serial No Date Comments ...