ISO-HPO-2
World Precision Instruments
9
11. After 10–15 minutes the current should no longer be offscale and will gradually
decrease with time. It may take a couple (up to 2) hours for the sensor current to
reach a low stable value, at which time it will be ready for use.
TIP
: The integrity of the new membrane can be determined by immersing the
probe tip into a strong saline solution (1M). If the current increases dramatically
or is offscale then the membrane integrity is not good and a new membrane will
have to be fitted. Additional
ISO-HPO-2
membranes (packages of 4) are available
(WPI #
600012
).
ACCESSORIES
Part Number
Description
5399
T-Adapter Kit (pkg. of 3)
600011
ISO-HPO-2
Startup Kit*
600012
Replacement Sleeves (pkg. of 4)
100042
ISO-HPO-2
Electrolyte Filling Solution (10mL)
7363-4 Enzol
- Enzymatic detergent (1 gal.)
MF28G67-5 MicroFil
electrolyte filling needle (pkg. of 5)
*The
ISO-HPO-2
start-up kit (WPI #600011) contains everything needed to begin
working with this sensor, and the kit is highly recommended for first-time
ISO-HPO
users. The kit includes:
•
(1)
600012
- Four additional membrane sleeves
•
(1)
100042
- 10mL Electrolyte filling solution
•
(1)
MF28G67
- MicroFil™ electrolyte filling needle, 28 AWG (67mm long)
•
(1)
3563
- 1mL syringe
•
(2) sample vials with lids and stoppers
•
(1) Male luer fitting, 1/8” ID barb
•
(1) 25g Needle
Fig. 6—The startup kit is recommended for first time users.
Summary of Contents for ISO-HPO-2
Page 2: ......