background image

If Your Thermo-sealer does not work correctly, carry out the following checks before contacting the Technical Service:

6.Troubleshooting

Envelope cutting is difficult.

  SUGGESTED SOLUTION

12

  

 

The LED is solid red and the

machine is emitting an

acoustic signal

NOTE

SHOULD THE PROBLEM PERSIST, PLEASE CONTACT OUR TECHNICAL SERVICE NETWORK

REPORTING THE THERMOSEALER MODEL AND ITS SERIAL NUMBER.

THESE DATA CAN BE FOUND ON THE FACTORY PLATE PLACES ON THE UNIT REAR.

PROBLEM

POSSIBLE CAUSE

The thermo-sealer does

not switch on.

The plug of the power supply cable is not inserted

inthe outlet.

Properly put in the plug.

Lack of power at the power supply outlet.
The magneto thermal switch and/or differential switch

of the installation are OFF. 
Mains fuses broken

Check the possible cause of power

failure and try to solve it.

Replace the fuses

(see Appendix C - Maintenance)

Put the switches to ON position.

The LED does not fl ash when

the thermo-sealing machine

is switched on

Heating resistance broken. 

Contact the Technical Support Service

Bag sealing is performed but

the LED remains a fixed green

 (instead of red) and no

acoustic signals are heard.

Fault of the end-of-run microswitch. 

Insufficient pressure in the sealing area.

Silicon rubber profile damaged.

Resistance does not reach the operating temperature

The Led does not work.

Fault in the electronic card.

Contact the Technical Support Service

 Consumed blades.

Contact the Technical Support Service

Contact the Technical Support Service

Operator warning signal

SIGNAL 

ACTION

CAUSE 

The LED is fl ashing green

The machine is warming up

Wait until the machine warms up.

The LED is steady green

The machine is ready for use

The LED is fast fl ashing green The sealing handle has been lowered and the

machine is in use

Wait for the acoustic signal, lift the lever

and remove the bag

The green LED emits a brief

flash every 5 seconds

The machine is in a paused status after a period

of inactivity of 30 minutes.

Lower and lift back up the 

 to rest

normal operation.

handle

The red and green LEDs 

flash at the same time

The machine signals the presence of a heating

system problem.

Switch off and retry machine use. If the

signal recurs, contact Technical Support.

The sealing operation has been completed 

The machine is on with the sealing lever down
The sealing 

 was lowered before reaching

the proper operating temperature

handle

Lift the handle

Lift the 

 and remove the bag

handle

Summary of Contents for SELINA

Page 1: ......

Page 2: ......

Page 3: ...PAY SPECIAL ATTENTION NOTES FOR PROPER INSTALLATION AND MAINTENANCE PROCEDURES AND USE METHODS WARNING THIS SYMBOL INDICATES A POTENTIAL DANGER OF INJURY FOLLOW THE PROCEDU RES DESCRIBED IN THE MANUA...

Page 4: ...is an elegantly space saving designed piece of equipment that is both user friendly and reliability even with heavy use SELINA is therefore a useful option for all those users who require professiona...

Page 5: ...2 3 4 SELINA Thermo sealing machine Operation Panel Reel dividers Reel holder 5 Paper stop barrier 1 Parts description Fuse Power lead Operation manual 9 6 7 8 Screws for two handles 3 8 5 7 6 4 1 2 3...

Page 6: ...ids that could cause short circuits or situations potentially dangerous for the operator Do not install in humid or poorly ventilated environments Do not install in environment with the presence of in...

Page 7: ...arefully remove the package contents 2 3 2 Take the operation panel out and insert in the appropriate slots And pull back the right and left holder supporters until it reaches to the table In complian...

Page 8: ...ilization bag on the roll holder tube Install the roll holder roll unit on the arm holders as described in the previous paragraph positioned in such a way that the paper belt unrolls downward and with...

Page 9: ...t pass under the paper stop barrier and insert it in the rear slot Then remove it from the front to the desired length You can measure the size of sterilization bag which you need before sealing and c...

Page 10: ...instruments into the open side of the bag and Insert the unsealed end of the bag in the front slot F a few centimetres until the end of the bag is aligned with the upper slot G Perform sealing operat...

Page 11: ...m At constant temperature Intemal use Altitude up to 3000m Temperature 5 40 Relative max humidity 10 Installation category overvoltage category II With continuous cycle and constant temperature Nomina...

Page 12: ...ted This operation will be indicated by an acoustic signal and intermittent red LEDs Anti finger c rus hing des ign Protection from accidental crushing of fingers during lever movement Automatic S tan...

Page 13: ...ould irremediably damage its operation Do not use abrasive sponges metal brushes or other aggressive materials or products for cleaning of metal both solid and liquid DANGER BEFORE PERFORMING ANY MAIN...

Page 14: ...o acoustic signals are heard Fault of the end of run microswitch Insufficient pressure in the sealing area Silicon rubber profile damaged Resistance does not reach the operating temperature The Led do...

Page 15: ......

Page 16: ......

Reviews: