25
Reinstall rod into lever bracket hole and add cotter pin. (See FIG 14)
FIG 14
5.2.8
Blade Control Rod Adjustment
Stop engine, wait for all moving parts to stop, and remove key or pull out spark plug lead.
Blade handle should be in the engage position. Handle should compress pressure switch at least 5mm, if not rod
length should be adjusted. To change rod length, remove cotter pin from upper Blade Control Rod Assembly.
Remove rod from lever bracket hole. Rotate rod until desired length is achieved to cause switch to compress
correctly. Reinstall rod into lever bracket hole and add cotter pin. (See FIG 15)
FIG 15
5.2.9
Gear Case Maintenance (oil change)
Service Interval:
First time service
:
80hrs.
Thereafter
:
300hrs.
Maintenance Method:
Stop engine, wait for all moving parts to stop, and remove key or pull out spark plug lead.
Remove oil plug and let oil drain into appropriate container.
NOTE: Engine oil in gear case must be completely drained.
Tighten the oil plug.
Tighten the filter.