Workrite Ergonomics | 800.959.9675 www.workriteergo.com
13 of 18
Parts Included
Cable Trough Parts List
Assemble Cable Trough
9.1 Align Left Trough End (B) and Right Trough
End (C) with the Cable Through (A)
9.2 Attach with (2) #10-32 x ½”Pan Head
Machine Screws (D) and (2) 10-32 Hex
Nuts and (1) 10-32 x ¼” (F)
Note:
If installing the Laminate Modesty
Panel refer to the assembly instructions
provided with the Modesty Panel
A
Cable Trough
Qty: 2
B
Left Trough
End
Qty: 2
C
Right Trough
End
Qty: 2
G
#12 × 3/4" Pan Head
Wood Screw
Qty: 8
53" or 65" long
D
#10-32 × 1/2" Pan Head
Machine Screws
Qty: 8
E
#10-32 Hex Nut
Qty: 4
F
#10-32 × 1/4" Pan Head
Machine Screws
Qty: 2
Install Cable Trough
10.1 Align Cable Trough assembly with pre-drill mounting
locations in Top
10.2 Attach Cable Trough Assembly to Top with (8) #12 x ¾”
Pan Head Screws (G) as shown
Repeat as required for additional
stations in your Benching System
9
B
C
A
D
D
D
D
E
F
F
Trough only installation
9.1
9.1
9.2
9.2
10
G
Access hole
10.2
10.2
10.1
10.1