
IN
S
TA
LL
AT
IO
N
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH
17
UNPACKING THE BOILER
UNPACKING THE BOILER
8-716-106-256a (08.05)
Unpacking:
1 Cut the ties securing the carton taking care
not to pierce the carton or cause personal injury.
2 Open the top flaps of carton and lift carton up
and away from the boiler.
Remove the plastic bag and upper front
protection cover from the boiler and place safely
aside.
3 Pull base of front panel (E) away from the
boiler to disengage ball stud connectors.
Lift front panel (E) upwards off the top
supporting ledge and store safely away from the
working area.
At least two or more persons are required to
move the boiler, taking care not to damage the
boiler, panels or the floor.
At all times the correct method for handling
heavy objects should be strictly observed.
GENERAL HANDLING GUIDELINES:
Lift only a manageable weight, or ask for help.
When lifting, bend the knees, and keep the back
straight and feet apart.
Do not lift and twist at the same time.
Lift and carry items close to the body.
Wear protective clothing and gloves to protect
from any sharp edges.
IMPORTANT: All the previous Pre-Installation sections must be read and
requirements met before starting boiler or flue installation.
1
3
E
2