INSPECTION AND SERVICE
Remove electrical connector from fan.
4
Undo and remove securing nut (H) from the
top of the heat exchanger.
5
Remove retaining plate (I).
6
Rotate fan and air/gas manifold assembly (J)
around the top of the heat exchanger until it
stops at the lug.
Lift up assembly and remove from boiler.
7
Disconnect spark electrode and flame sensor
connections (K).
Remove clamping plate (L).
Remove spark/flame electrode assembly
from boiler.
Remove seal from the top of the heat
exchanger.
4
5
H
I
6
J
7
L
K
INSPECTION AND SERVICE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR Ri
8 716 115 168a (06/2008)
36
S
E
RV
ICI
N
G
& S
P
AR
E
S