![Worcester GREENSOURCE 6 kW Installation Manual Download Page 37](http://html1.mh-extra.com/html/worcester/greensource-6-kw/greensource-6-kw_installation-manual_996561037.webp)
37
Commissioning report
Client / Installation address:
Installer:
Heat pump description:
Commissioning date:
Heat pump serial number:
HWDU serial number:
Other components of the installation:
Outdoor sensor T2
......................................
Room sensor T5
......................................
Hot water cylinder temperature
sensor T3
......................................
Others: ...............................................................................................................................................................................................................
Points to be checked prior to commissioning
Heating system
(pressurised and vented):
fi lled
checked
Notes: ......................................................
Electric heater set to 4.5 kW:
set
checked
Notes: ......................................................
Filters:
checked
cleaned
Notes: ......................................................
Sight glass (green):
checked
Notes: ......................................................
Heating system pump G2 working correctly: ................
Heat carrier pump G3 working correctly: ................
Temperatures after 10 minutes heating or hot water mode:
Heat fl ow out T8: ............./..............˚C
Heat return in T9: ............./..............˚C
Sensor condensor temp T10: ........../...........˚C
Refrigerant temp T11: ........../...........˚C
Defrost sensor T12: ........../...........˚C
Summary of Contents for GREENSOURCE 6 kW
Page 45: ...45...