Open all system and radiator valves.
4
Turn on the water main stop cock.
4
Open vented systems only:
4
Turn on the water to the system feed and
expansion cistern and allow the system to
fill.
2
4
Sealed systems only:
4
Check and if required, adjust the expansion
vessel pressure using the Schraeder type
valve.
4
Fill the system to between 1 and 2 bar
pressure via a WRAS approved filling link.
4
Monitor the pressure gauge during venting
and repressurise if required.
3
4
Vent all radiators, retighten when completed.
4
Check the system and correct any leaks.
4
Bleed air from at least one of the secondary
heat exchanger air vents (a radiator key is
ideal for this). There are two venting
bosses (A) on the top of the secondary
heat exchanger. Only one is used if fluing
to the side. The (A) in use and (B) must be
bled.
4
Bleed air from the primary heat
exchanger air vent (B).
FILLING THE SYSTEM
2
1
3
1 - 2 bar
A
A
B
FILLING THE SYSTEM
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY KITCHEN 12/18-18/25-25/32
8 716 113 000a (01/07)
33
C
O
M
M
IS
S
IO
N
IN
G
Summary of Contents for 12/18
Page 53: ...52 ...
Page 54: ...53 ...
Page 76: ...NOTES GREENSTAR CAMRAY KITCHEN 12 18 18 25 25 32 8 716 113 001a 01 07 17 NOTES NOTES ...