User manual
Hoof trimmingcrush:SA0049
Version: 22-12-15
Page 24 of 31
6. Maintenance
CAUTION!
Test the installation on completion of maintenance work or repairs to ensure that it
can be used again safely.
Only trained technical personnel may carry out the maintenance activities
described or repair work.
6.1. Maintenance diagram
The diagram below shows the maintenance activities to be carried out.
Activity
note
Da
il
y
week
ly
Every 10
0 an
imals
Annu
all
y
Every 2
ye
ar
s
See
Section
General
Check on panic locks and
hooks.
Renew where damage is visible.
Check ropes and chains.
Renew where damage is visible.
Check plugs, cables, controls
and connections.
Alert a competent fitter where
damage is visible.
Check that the left and right front
leg ropes are hanging at equal
lengths.
Where these are driven by a single
motor.
Cleaning
Clean the machine.
Lubrication
Grease nipples on rear gate
sliding section.
Bearing grease.
Other grease nipples.
Bearing grease.
Hydraulic installation
Check the oil level.
Checks must be carried out after 500
cows or where leakage occurs.
Replace oil and filter.
Axle and wheels
Check play in the wheels.
Check the tyre profile.
Have this inspected by a competent
person.
Check the tyre pressures.
Have this inspected by a competent
person.
Drawbar