2.2. Electrical installation
FUNCTION
The electrical installation supplies the power for the hydraulic power unit, lighting
and sockets.
See the electrical diagram in the control panel of every crush for the rest of the
structure and controls of the electrical installation included in the delivery.
The placement of the control components on your installation may differ from
the photo below.
ATTENTION
!
Work on the electrical installation can only be carried out by a technical expert.
The installation consists of the following components
Component
Description
Section /
location
1
Power supply cable
To connect the machine to the power supply.
2
Emergency stop
The emergency stop switches off all operations.
3
Power unit start/stop
button
Pushing the button switches the power unit on or off.
4
Three-phase current
switch
This switch is only present if the controls are suitable
for 3-phase current (option).
The switch must be set to position 1 or 2, depending
on the direction of rotation of the power network one
wants to connect to. The hydraulic power unit can
only pump oil in 1 of these positions. If no oil is being
pumped, the switch must be flipped immediately to
prevent damage to the installation.
5
Sockets
The grinders can be connected to these.