FORM:SBTM OWNERS MNUL
REV: 8-03-10
APPR BY: EW
43
1. Place the new slat crosswise on the lateral belt. Screw in two new screws on
either side.
NOTE: All four (4) screws must be positioned in the slat before
tightening the individual screws
.
2. Then mount the covers back in position.
Bearing Guide
Required tools:
17 socket wrench element with 3” extension; ½" wrench, 17 ring fork
wrench
Removal:
1. Remove the covers. See page 29.
2. Remove the bearing guide fastening screws.
3. Unscrew the threaded pins in the bearing sleeve.
4. Then pull the bearing guide from the side using an extractor device.
Replacement:
In reverse order of removal. Tighten the screws to approx. 54 foot pounds (screw the
studs tight).
Belt Roller Guide and Track Rollers
Required tools:
13 socket wrench element and wrench with 3" extension, 13 ring fork
wrench
Removal:
1. Disconnect the appliance and remove the protective covering from the side
concerned.
2. Remove the roller unit, screw and nut. Then install a new roller using the old
screw and nut. Tighten the screw and nut to 18.8 foot pounds.
Front and Rear Deflection Rollers
Repairs to the front and rear deflection rollers should be replaced by the WOODWAY
customer service or following consultation with the factory.