background image

Woodway Engineering Ltd 

Lower Road, Barnacle

Coventry, CV7 9LD

United Kingdom

Tel:  +44 (0) 24  76 841750 

Fax:  +44 (0) 24  76 621796

[email protected]

www.woodwayengineering.com

I N S T A L L A T I O N   G U I D E

9

System Installation Wiring Diagrams

Auxiliary Relays

Beta Siren - Hands Free Control

+VE SUPPLY TO

AUXILIARY EQUIPMENT

+VE SUPPLY FOR

AUXILIARY EQUIPMENT

FUSED AS REQUIRED

OUTPUT FROM 

OUTPUT/RECEIVER

CHASSIS GROUND

FIGURE 4: OUTPUT/RECEIVER RELAY CONNECTIONS 

Socket SK3 

Pin

Wire Colour 

Function

1

Figure 5  

2
3

White/Orange

Hands Free

Plug P3 

Pin

Function

Wire Colour 

1
2
3

White/Orange

Hands Free

Socket SK4 

Pin

Wire Colour 

Function

1

White/Blue

 

 +

c

i

M

2

White/Black

Mic -

3
4

White/Violet

PTT

Plug P2 

Pin

Wire Colour 

Function

1

Red/White 

Not Used

2

White/Green

Horn Ring 

3

White/Brown 

Wail

4

White/Red

Yelp

5

White/Orange

Hands Free

6

White/Yellow 

Not Used 

7

White/Violet

PTT

8

White/Black

 

 -

c

i

M

9

White/Blue

 

 +

c

i

M

For connections see siren 

installation document 

From Opti-Din output 

module output 13 

Opti-Din output 

PA connection from 

module

Summary of Contents for Opti-Din

Page 1: ...y Engineering Ltd Lower Road Barnacle Coventry CV7 9LD United Kingdom Tel 44 0 24 76 841750 Fax 44 0 24 76 621796 sales woodwayengineering com www woodwayengineering com IN STALLATION GUIDE Opti Din H...

Page 2: ...s manual Disclaimer Important Installation and Safety Notes CAUTION Modules and connectors are not waterproof Install modules and cables in a dry location away from excessive heat humidity and any com...

Page 3: ...g The switch outputs from the Output Receiver Module interface directly with the low current control wiring of Woodway supplied light bars sirens and strobe power supply systems The outputs may be use...

Page 4: ...aggering the programmed switch activation When the battery supply falls below 12 volts providing no channels are selected the power down timer will start up After 20 minutes the unit will power down a...

Page 5: ...amming or press 999 arrival reset again to reset the keypad then the keypad button press above can be performed to return to normal operation To reprogram the arrival activated channels follow the pro...

Page 6: ...g mode press and hold the channel 6 selection key and repeat the operation above If more than one self cancelling group channel is incorporated as part of a 999 or arrival selection all channels will...

Page 7: ...s not flashing Communication fault Check data link connections are secure Check fuse Check voltage Check switch panel is plugged in Is the switch panel damaged or otherwise non functional High pitch w...

Page 8: ...CV7 9LD United Kingdom Tel 44 0 24 76 841750 Fax 44 0 24 76 621796 sales woodwayengineering com www woodwayengineering com INSTALLATION GUIDE 8 System Installation Wiring Diagrams 1 2 3 4 5 6 7 8 9 1...

Page 9: ...OUTPUT RECEIVER RELAY CONNECTIONS Socket SK3 Pin Wire Colour Function 1 Figure 5 2 3 White Orange Hands Free Plug P3 Pin Function Wire Colour 1 2 3 White Orange Hands Free Socket SK4 Pin Wire Colour...

Page 10: ...odway Engineering Ltd Lower Road Barnacle Coventry CV7 9LD United Kingdom Tel 44 0 24 76 841750 Fax 44 0 24 76 621796 sales woodwayengineering com www woodwayengineering com INSTALLATION GUIDE 10 Note...

Page 11: ...odway Engineering Ltd Lower Road Barnacle Coventry CV7 9LD United Kingdom Tel 44 0 24 76 841750 Fax 44 0 24 76 621796 sales woodwayengineering com www woodwayengineering com INSTALLATION GUIDE 11 Note...

Page 12: ...ring Ltd Lower Road Barnacle Coventry CV7 9LD United Kingdom Tel 44 0 24 76 841750 Fax 44 0 24 76 621796 sales woodwayengineering com www woodwayengineering com Made in the UK ISO 9001 2015 Certified...

Reviews: