background image

2

RECOMMENDATIONS

Please read the components list BEFORE assembly, make sure that no parts are damaged or missing.

Read through the complete assembly instructions again.

Assemble all parts according to the instructions in this manual and do not skip any step.

Treat the wall panels with extreme care before and during assembly. Carefully place them on the ground.

Avoid stepping on or placing any objects on it.

At least two people are required to assemble the garden sheds.

Recommendation: Build a base of wood/composite or concrete as a foundation.

Leave enough space at the installation site outside of the WPC shed so that you can access the WPC Garden 

sheds from the outside during assembly.

Remove all parts from the packaging and spread them out on a clean work surface by Area I/II and III.

Due to the high proportion of wood, the surface may have different shades and change color over time. This 

does not require special treatment, nor does it affect the life of the WPC Garden sheds.

If you want to paint the WPC shed, please ask a professional painter for advice on choosing the right colors 

for the wood-plastic composite material.

Do not use aggressive cleaning agents as they can stain or damage the WPC shed.

CARE AND SAFETY INSTRUCTIONS 

 The garden shed is generally used for storing objects. The WPC shed is not especially designed for 

residential purposes.

 It is recommended to anchor the WPC shed on an immovable object or foundation (it will serve as storm 

protection).

 Do not set up on a windy or cold day.

 Check the WPC shed regularly for stability and make sure that the location is level.

 Be careful when handling parts with steel edges.

 For the construction and handling of the WPC shed, please only use tools that are listed in the assembly 

instructions.

 Always wear work gloves, safety glasses and any other kind of clothing with long sleeves when 

assembling the garden shed or performing any kind of maintenance work.

 Avoid using lawnmowers and mechanical scythe in the immediate vicinity of the WPC shed.

 Always wear safety goggles and always follow the manufacturer’s instructions when using power tools.

 Clean the WPC shed with a garden hose and a mild detergent. You can use a hard brush but do not use any 

abrasive or degreasing agents, as well as cleaning agents containing oil or acetone, as these can stain or 

damage the product.

 Do not store any hot objects in the WPC shed, such as recently used grills or blowtorches, or any volatile 

chemicals.

 Do not lean heavy objects against the walls of the WPC shed, as this could distort the entire WPC shed.

 Keep the roof free of snow and accumulated foliage. Large amounts of snow can damage the WPC shed 

and make it dangerous for entering.

Make sure there is su

cient ventilation at the WPC shed. This way you avoid moisture.

 Cover the roof of the WPC shed with a tight roof covering. Pay attention to the roof slope. A self-adhesive 

sealing membrane is best suited.

 The wind direction is an important factor that must be taken into account when setting up the WPC 

shed. Try to avoid placing it anywhere where there could be excessive wind loads, especially high wind 

pressure on the doors. Always keep the doors closed and locked when the WPC shed is not in use to avoid 

any kind of wind damage.

 Please contact your local authorities to inquire if a permit is required to build the WPC shed.

Summary of Contents for Bao Basic

Page 1: ...Installation Guide 7x7 4 25 m 130mm 130mm 2110mm 2124mm 56mm 50mm...

Page 2: ...that the location is level Be careful when handling parts with steel edges For the construction and handling of the WPC shed please only use tools that are listed in the assembly instructions Always w...

Page 3: ...8mm Garden Shed Three view Drawing Tools Required for Installation 3 2370 2124 123 123 2124 2230 1964 2008 2370 2124 2222 1875 2124 56 50 2222 1875...

Page 4: ...ront 59x59 L 2222mm Aluminum Column Right Front 1 1 59x59 L 2008mm Aluminum Column Left Rear 59x59 L 2008mm Aluminum Column Right Rear 1 1 59x30 L 1350mm Aluminum Threshold 1 30x27 L 1875mm 30x27 L 18...

Page 5: ...Screws Screws 1350X1830 8X80 1 4X16 220 18 A 4X10 B C 5X20 5X45 Rivet 12 45 5X60 12 Connector 50X50 6 D Latch 2 Hinge 4 E Plastic Cap for Aluminum Verge Board 4 80 F H I J K G Door Lock Kit 1 18 19 20...

Page 6: ...hould be installed on the hard ground like concrete foundation the surface of ground should be flat and the size should follow the dimension of drawing Bottom Beam Dimension Drawing 6 2200 2124 2124 3...

Page 7: ...ll aluminum bottom frames according to dimensions and positions as the sketch map shown above then fix them with plastic expansion bolts Please make sure the leveling of the bottom frames A 16x 1 1 1...

Page 8: ...m bottom frames then fasten column and planks with screws Two operators are required for this step one needs to hold the column so as to avoid any broken caused by tilt We suggest to install garden sh...

Page 9: ...Install the WPC plank wall one by one Install the column left rear into place 19 19 2 1 1 1 1 1 1 1 1 4 2 19 9...

Page 10: ...Install the WPC plank wall one by one Insert the aluminum H shaped beam left right into the column then install WPC plank wall into the place one by one 2 2 9 9 1 1 1 1 1 1 1 1 4 4 19 20 19 10...

Page 11: ...place then insert the aluminum H shaped beam rear into the column Install the aluminum column right front into the place then insert the aluminum H shaped beam left right into the column 19 19 19 19...

Page 12: ...Install front WPC plank wall and aluminum H shaped beam front into the place X2 19 X2 19 19 19 9 9 9 9 9 2 5 4 3 12...

Page 13: ...uminum threshold and adjust perpendicularity and dimension between the two frames shown as the above sketch map After adjustment please fix WPC plank wall aluminum bottom frame and aluminum H shaped b...

Page 14: ...15 14 16 Install window into the place Please note different sides of window the side with rivets should be toward the inside Fasten the window with columns and H shaped beams by using screws 14...

Page 15: ...Connect the aluminum beams with window left right side by using rivets C D 13 13 13 13 13 13 13 13 Connect the aluminum beams with L brackets by applying rivets in advance C D 15...

Page 16: ...he extension length of roof tile should be 60mm in the shed s front side while the left and right side should be 130mm Please note that the length of screws for roof tiles xing is different from those...

Page 17: ...17 17 17 Install roof tiles one by one please pay attention to the connection method shown as the above sketch map 17...

Page 18: ...Install all aluminum verge boards in line with the diagram as above J J J J J 12 11 11 12 12 10 10 10 18...

Page 19: ...e position where needs to install it Put a subplate with a thickness of 5mm under the door Insert the other side of hinge into the place and mark the position with a pencil Remove the door then fix hi...

Page 20: ...ed the screws when packing so the door handle cannot be used as default when you unpack it firstly 2 Please unscrew the screw see picture above firstly then rotate the handle by 90 clockwise or anti c...

Reviews: