background image

R

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

R

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

R

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

R

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

R

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

R

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

R

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

R

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

WOODBRIDGE 

2

Hydromassage 

Pump 

Electrical  

Power  Outlet

Air  Blower 

Hydromassage 

Pump 

Electrical  

Power  Outlet

Air  Blower 

 Heater 

 Heater 

ROUGHING-IN 

 

 

55"

29 1/8"

19 5/8"

25 1/4"

31 1/2"

19 5/8"

41 3/4"

71"

17 3/4"

71"

14 1/2"

Water depth

BEFORE YOU BEGIN 

PRODUCT REQUIREMENTS 

A. Summary Of Key Requirements 

 Observe all local plumbing codes,

 Install the unit to a level subfloor

,Provide properly

 -dimensioned framing.    

B. Product Inspection 

Uncrate and inspect bath for damage. Leave all materials in the crate during construction to 
prevent damage.

 

  Please read these instructions carefully to familiarize yourself with the required 

 tools, materials, and installation sequences. Follow the sections that pertain to your 
 particular installation. This will help you avoid costly mistakes. In addition to proper 
 installation, read all operating and safety instructions. 

•  

All information is based on the latest product information available at the time of 

 publication. WOODBRIDGE

® 

 reserves the right to make changes in product 

 characteristics, packaging, or availability at any time without notice. 

22 7/8" 

16 7/8"

66 1/2"

41 3/4"

31 7/8"

20 1/2"

IMPORTANT     INFORMATION 

 Measurements are ± 1/2" and subject to change without notice 

• Specifications & Configurations are subject to change without notice

 Please measure tub on-site before installation

 

• Please note that installer(s) must be certified or warranty will be voided.

 •

 Measurements herein supersede all others published prior to purblication

   date shown below
 

 Before ordering or installing, please consider future access to equipment

BJ300

BJ200

Built-in heater for consistent water temperature

Summary of Contents for BJ200

Page 1: ...rdance to your location We are not responsible for providing any compliance certi cations Under no circumstances we shall not be liable for any incidental damages sustained in connection with this pro...

Page 2: ...ar installation This will help you avoid costly mistakes In addition to proper installation read all operating and safety instructions All information is based on the latest product information availa...

Page 3: ...ration Position the plumbing according to rough in dimensions Cap the supplies and check for leaks BEFORE INSTALLING UNIT CAUTION Ensure a watertight seal on the bath drain connections A Install the f...

Page 4: ...er two minutes Check the pump and pipes union connections for leaks Hand tighten union connections if required IMPORTANT Your bathtub has been factory tested and approved It is the responsibility of t...

Page 5: ...Dedicated GFCI Breaker R E S E T CGFI Outlet 3 Total Breakers CGFI Outlet RESET BJ200 BJ300 5 10mm 02 to 0 4 For Air Bath and Whirpool Tub installation Do not apply any silicone sealant after install...

Page 6: ...5 NOTES DATE OF INSTALL INSTALLER S NAME PLUMBER CONTRACTOR LICENSE INSTALLER INFORMATION NOTES DATE OF INSTALL INSTALLER S NAME PLUMBER CONTRACTOR LICENSE INSTALLER INFORMATION 6...

Page 7: ...ully insured and licensed contractor only Installation by anyoneother than fully insured and licensed contractorwillvoid this limited warranty This warranty does not cover surface damaged caused by us...

Page 8: ...urface shine is restored Repair and Maintenance The bathtub must be installed and used as described in this manual Use caution when entering or exiting the bathtub Do not permit children or persons wi...

Reviews: