Gas Plancha (GEN1)
Service Manual
PG
63
OF
64
M0102.20 JULY 2019
An ongoing program of product improvement may
require us to change specifications without notice.
WOOD STONE CORPORATION
1801 W. Bakerview Rd.
Bellingham, WA 98226 USA
TOLL FREE
800.988.8103
TEL
360.650.1111
FAX
360.650.1166
woodstone-corp.com
SOLENOID/GAS VALVE SERVICE, v2 & 3
File Location: \\woodstone.net\dfs\CAD\Manuals\M0102\Rev 02\0_Service_Manual-1.dft
REV:
DATE:
PART #:
WS-PL-4836-4-CT00NG
5/13/2015
bena
DWN BY:
SHEET:
PL4836
4 - Zone Gas Plancha
2
13 of 13
Gas Solenoid Service
1.
Remove retainer "C-clip" on top of valve stem.
2.
Slide coil off of valve stem.
3.
Install new coil onto valve stem.
4.
Re-attach retainer "C-clip" on top of valve
stem.
Gas Valve Service
1.
If entire valve needs replacement, either remove
pressure manifold or remove gas tube(s) from
appropriate valve.
2.
(3) of the 1/4" DC valves can be rotated on their axis
and removed from manifold.
3.
Remaining 1/4" DC valve requires the main manifold
to be removed.
Gas Valve
Gas Valve
(x4)
NOTE: Valves must
be angled as shown
Regulator
PL-4836
VERSION 2 & 3:
POST JUNE 2013
1/2" AC Gas Solenoid Valve
1/4" DC Gas Solenoid Valve