![Wood-mizer SLAB-MIZER MB200AF Installation Manual Download Page 8](http://html1.mh-extra.com/html/wood-mizer/slab-mizer-mb200af/slab-mizer-mb200af_installation-manual_994586008.webp)
SLAB-MIZER AUTO FEED INSTALLATION
Publication 2/17/21
8 of 18
Form 2452
9.
Put wire from
5 Orange
terminal block to main motor VFD R1C.
10.
Remove
orange wire
from small feed motor VFD LI1 and put in
7 Yellow
terminal block.
11.
Put wire from
7 Yellow
terminal block to small feed motor VFD LI1
12.
Remove
orange wire with brown tracer
from small feed motor VFD LI2 and put in
8
Gray
terminal block.
FIG. 9