SETUP & OPERATION
Planer/moulder setup
3
3-5
EGdoc071420
3.3
Planer/moulder setup
IMPORTANT!
Before starting to use the planer/moulder you have to
meet the following conditions:
Set up the planer/moulder on firm, level ground and level the planer/moulder. Secure the
planer/moulder to the ground to prevent moving during operation. A cement pad with 12
mm diameter anchor bolts is recommended.
Indoors the planer/moulder can be operated with the sawdust collection system only.
The planer/moulder can not be operated when it is raining/snowing and in case of rain or
snow the machine must be stored under roof or indoors.
The planer/moulder can be operated in temperature range from -15
o
C to 40
o
C only.
The illumination at the operator's position should be at least 300lx
1
.
The planer/moulder’s operator position and E-Stop safety buttons location are shown
below.
See figure 3-8.
1. Light source can not cause stroboscopic effect.
FIG. 3-8 MP360
!
E-STOP
Operator’s
position