![Wood-mizer LT40DC Series User Manual Download Page 59](http://html.mh-extra.com/html/wood-mizer/lt40dc-series/lt40dc-series_user-manual_994653059.webp)
Setup & Operation
Preparing The Sawmill For Towing
Setup & Operation
30Sdoc120507
2-32
2
2.19 Preparing The Sawmill For Towing
The Wood-Mizer trailer package makes transporting your sawmill easy and convenient.
To get your sawmill ready for towing, follow these instructions.
CAUTION!
If the weight of the sawmill exceeds 3,000 lbs
(1361 Kg) for any reason, an auxiliary braking system (such
as electric brakes) must be used. Failure to do so may
result in severe machine damage.
1.
Move the saw carriage to the front end of the sawmill. Raise the rear outriggers.
2.
Move the carriage forward to the travel position over the rear bed rail.
3.
Position the hole in the saw head over the travel rest pin.
4.
Lower the saw head until it is seated firmly on the rest pin.
See Figure 2-16.
FIG. 2-16
HD0075
Rest Pin
Lock Pin