SECTION 2 SETUP & OPERATION
2.1
Stationary Sawmill Setup
See Figure 2-1.
Set up the mill on firm footing and level by eye. Fasten the mill to the floor to pre-
vent any creep after prolonged use. A cement pad with 5/8” diameter anchor bolts is recom-
mended. The cement pad should be rated to support 6350 lbs./sq.ft. at each sawmill foot position.
NOTE:
Make sure the unit is level before securing. It IS possible to twist the mill frame by jacking
one foot higher than the others.
WARNING!
Securely fasten the feet of a stationary sawmill to
the floor before operating the sawmill. Failure to do so may result
in serious injury or death.
FIG. 2-1
HD0131ce_d
1790
820
2590
850
2820
2620
810
1935
820
3830
2040
825
2790
775
LT40 S Stationary Metric Dimensions*
LT40 M Stationary Metric Dimensions*
*All dimensions in millimetres