![Wood-mizer LMS-HPR Safety, Installation, Operations & Service Download Page 8](http://html1.mh-extra.com/html/wood-mizer/lms-hpr/lms-hpr_safety-installation-operations-and-service_994550008.webp)
Installation
Control Box Installation
1
1-5
LMS99doc032619
Installation
1.2
Control Box Installation
Rev. E.00+ Only:
DANGER!
The key switch should still be off, the key
removed and the negative battery cable disconnected as
stated at the beginning of this section. The incoming power
supply of electric-powered sawmills should be discon-
nected and locked out. Failure to do so will result in serious
injury or death.
IMPORTANT!
Avoid pinch and pivot points, unnecessary
wire bending and open spaces where the wire could get
caught by a log, etc. If you have any questions, call
Wood-Mizer customer service.
1.
Remove the rear panel assembly from the control box.
2.
Remove the left control box side panel from the sawmill control box. Position the LubeM-
izer control near the opening and connect as described below. After wiring, the lube con-
trol assembly will be secured in place.