Wall Preparation
Minimum 2"
(51)
x 4"
(102)
lumber is required to construct
wall framing. Refer to the illustration below for mounting
hole locations and a cross-section view of a typical instal-
lation.
Pro Hood Liner Installation
8
Framing must be able to support the weight of the hood
and internal blower, if applicable.
2
3
/
4
"
(70)
8"
(203)
4"
(102)
2"
(51)
Mounting hole locations.
Installation cross-section.
DECORATIVE
HOOD
#10 x 2" (51)
SCREW
Hood Liner Preparation
IMPORTANT NOTE:
Remove all packaging material from
hood liner and damper. Failure to remove material will
obstruct airflow and significantly decrease performance.
1)
To remove filters, press upward then rotate bottom
outward. Refer to the illustration below. To aide in
removal, remove center filter first. Gloves should be
worn when handling filters.
2)
The damper is packaged inside the hood liner in a
separate box. Remove damper from box and place it
on top of the hood liner using the hold-down brackets.
3)
Secure hold-down brackets to damper flange with
screws provided. Refer to the illustration below.
4)
Seal with aluminum tape or high temperature duct
tape.
5)
Connect damper to duct using sheet metal screws and
aluminum tape or high temperature duct tape. Verify
screws do not affect the operation of the damper.
FILTER
SIDE VIEW
SPRING
LOWER
CHANNEL
Filter removal.
Mount damper.
HOLD-DOWN
BRACKET
DAMPER