Delivery / Handling
Space requirement
On the operating side, there should be at least one unit's width for installation,
operation and maintenance (see list below).
Space requirement for installation, operation and maintenance:
Fan section
0.8 x unit width
Cooler and heater section, RCS
1 x unit width + 250 mm
Filter section
1 x unit width
If units are arranged next to one another, the space listed above is required on
both sides for installation, operation and maintenance.
Units that require a siphon (scrubber, humidifier, cooler, KGX/KGXD plate heat
exchanger, mist eliminator) must be sited in such a way that the siphon can be
installed and operated unimpeded (observe height of foundations).
For units with a humidifier and/or cooler above rooms containing moisture-
sensitive equipment (e.g. computer rooms, etc.), we recommend waterproof
foundations.
For garage extractor fans, observe the conditions of the garage systems
regulations [or local regulations].
Delivery
KG 15-100 air handling units are delivered in transportable units.
Upon receipt of the goods, check the appliance or components for transport
damage.
If there is any damage or even a suspicion of damage, the recipient must
indicate this on the consignment note and have it countersigned by the haulier.
The recipient of the goods must notify WOLF of the relevant facts without delay.
Installation room
Only site the KG air handling units in a room that is free from the risk of frost.
If a risk of frost in the installation room cannot be excluded, take suitable steps
to prevent water-carrying components from freezing.
(See chapter "Frost protection measures".)
Please note
The units must only be transported in their installation position.
Otherwise the installed components will be damaged which can lead to
malfunctions.
Handle the units with lifting straps.
If moving the units with a forklift truck or on rollers, ensure that the supporting
forks or rollers are positioned underneath the frame sections and not under
the floor plates.
When lifting the units with the aid of eye bolts (on request), use lifting ropes
that give you a minimum eye bolt distance L. Keep ropes at the same length.
Units with more than 4 eye bolts must be lifted with a lifting beam.
Please note