Wolf I363418 Installation Instructions Manual Download Page 10

10

I N S T A L L   D U C T   C O V E R

1)

Duct cover must be installed to

ceiling prior to hood installation

2)

Use (4) ⁄" x 3" lag screws provided

with hood to attach duct cover to ceil-
ing frame work.  See page 3 for addi-
tional dimension information.

3)

Install additional #10 x 2" screws

for support along top edge of duct-
cover and ceiling.

4) 

Install (4) 5/16" bolts, provided

with duct cover, through hood
mounting holes into bottom edge of
duct cover.  Use 5/16" nuts supplied
with duct cover and tighten on bolts.
Use #12 x 7/8" hex head self tapping
screws provided with duct cover to
attach duct cover to hood assembly

P

R O

S

E R I E S

I

S L A N D

H

O O D S

I

N S T A L L A T I O N

I N S T A L L   H O O D   F I L T E R
A N D   D R I P   C U P S

Hood Filters and Drip Cups Install

1)

Reinstall hood filter center bank

with screws removed prior to installa-
tion of hood assembly.

2)

Remove all packaging material

from filters and drip cups.

3)

Slide drip cups along bottom edge

of hood opening so lip overhangs
slightly. 

4)

Lift filters into place.  Lines of fil-

ters must run vertically and align with
drip cups.

5) 

Adjust filters to fill space by sliding

filters left to right.

CAUTION

Installing a duct cover assembly
will impact all aspects of hood
installation including hood loca-
tion, ducting, electrical place-
ment and adequacy of mounting
surfaces.

I N S T A L L   L O G O

The nameplate is not pre-assembled

because there are various locations that

the logo can be installed. Additionally,

some customers prefer not to have a

nameplate on their hood. For your

convenience, Wolf has created a tem-

plate for a standardized logo location.

Please see the back page of these

installation instructions for Wolf logo

template.

1)

Decide on the location for the

nameplate.

2)

Clean mounting area with rubbing

alcohol.

3)

If desired, cut-out template for

nameplate location.

4)

Fold template, locate placement on

hood and tape to hood surface.

5)

Check alignment and adjust if nec-

essary.

6)

Remove backing paper from name-

plate.

7)

Position nameplate in template

cutout and press into place.

8)

Remove template and any tape

residue.

OPTIONAL

DUCT

COVER

     1/4" x 3" Lag Screw

5/16" SS Nut

   5/16" SS Screw

                       #1/4" x 7/8" #12

                   self-tapping hex screw

                       2" #10 hex screw

Duct cover installation 

Summary of Contents for I363418

Page 1: ...P R O S E R I E S I S L A N D H O O D S I N S T A L L A T I O N I N S T R U C T I O N S...

Page 2: ...ust be completed by a qualified installer or service agency Before you begin installation read these instructions completely and carefully INSTALLER please retain these instructions for local inspecto...

Page 3: ...re 16 gauge stainless steel shell Transition with backdraft damper included Optional decorative rail assembly in stain less platinum brass or copper finish Hood must be specifically preordered and con...

Page 4: ...recommends installing a back draft damper in all installations included with hood In cold weather installations a back draft damper is necessary to minimize the backflow of cold air into the room 4 Wo...

Page 5: ...t Part number 805669 18 457 HEIGHT OF HOOD 34 864 DEPTH OF HOOD 36 914 WIDTH OF HOOD 30 TO 36 762 914 TO COOKING SURFACE COOKING SURFACE LOCATION OF ELECTRICAL CENTERED THROUGH TOP OF HOOD 30 TO 36 76...

Page 6: ...aming for con duit wiring See Internal Blower on page 8 for overall dimensions and electrical requirements See installa tion instructions provided with the blower for mounting and installation informa...

Page 7: ...and tighten into 2x4 framing DO NOT OVER TIGHTEN SCREWS 8 Connect the 10 round ductwork to the hood transition using sheet metal screws or duct tape 9 Make electrical connections See Install Wiring on...

Page 8: ...uch as a tag to the service panel P R O S E R I E S I S L A N D H O O D I N S T A L L A T I O N I N T E R N A L B L O W E R IMPORTANT NOTE Before turning the power on make sure the blower is in the OF...

Page 9: ...the switch 3 Wiring Remote Blower Follow wiring instructions at the blower as outlined in the particular blower installation instructions Black L1 to black white neutral to white or white to blue or...

Page 10: ...into place Lines of fil ters must run vertically and align with drip cups 5 Adjust filters to fill space by sliding filters left to right CAUTION Installing a duct cover assembly will impact all aspec...

Page 11: ...ods DUC12COVER54I 12 duct cover for 54 island hoods DUC12COVER66I 12 duct cover for 66 island hoods P R O S E R I E S I S L A N D H O O D A C C E S S O R I E S B L O W E R S Internal Blowers IBLOWER 1...

Page 12: ...rail for 54 island hoods RAIL 66 SS Decorative rail for 66 island hoods Platinum Finish RAIL 36 PLT Decorative rail for 36 island hoods RAIL 42 PLT Decorative rail for 42 island hoods RAIL 54 PLT Dec...

Page 13: ...t 800 332 9513 or check our website www wolfappliance com When calling for service you will need the island hood model and seri al numbers Both numbers are listed on the rating plate located on the le...

Page 14: ...14 CUT OUT FOR LOGO PLACEMENT BOTTOM EDGE OF HOOD FOLD LINE FOR LOGO PLACEMENT LEFT OUTER EDGE OF HOOD...

Page 15: ...Wolf Appliance Company LLC P O Box 44848 Madison WI 53744 800 332 9513 www wolfappliance com 805050 7 03...

Reviews: