12
Boiler assembly
2
Position the thermal insulation for the
boiler back
over the rear connections and on the
back wall of the boiler.
3
Position the thermal insulation for the
boiler front
loosely on the boiler
4
Screws for securing the boiler
Screws for securing the boiler to the plinth
1
Boiler
• Install the plinth or the DHW cylinder
in accordance with the enclosed
installation instructions.
• Position the boiler with adjustable
bolts fully inserted using the
lifting slings on the fully assembled
plinth or DHW cylinder.
• To secure the boiler to the plinth or
DHW cylinder, tapped holes are
provided at the front sides of the
boiler. Additional fixings are not
required.
• Check the horizontal level of the
boiler together with the plinth and
DHW cylinder and adjust, with a slight
incline to the rear, if necessary.
Screws for securing the boiler
Fixing screws on the DHW cylinder
Position the thermal boiler insulation
around the boiler (overlapping) and secure
with spring clips.