Appendix
3066501_201910
WOLF GmbH | 79
12
Appendix
12.1 Commissioning report
Commissioning steps
Test values or confirmation
1.
Fuel oil
Standard EL
Low sulphur EL
Bio-oil B10
2.
Oil leak test carried out?
3.
Air/flue system checked?
4.
Water connections checked for tightness?
5.
Trap filled?
6.
Heat generator and system vented?
7.
System pressure 1.5 - 2.5 bar?
8.
Function test carried out?
9.
Flue gas test:
Gross flue gas temperature
_____________ tA [°C]
Intake air temperature
_____________ tL [°C]
Net flue gas temperature
_____________ (tA - tL ) [°C]
Stage 1: Carbon dioxide content (CO
2
) or oxygen content (O
2
)
_____________ %
Stage 1: Carbon monoxide content (CO)
_____________ ppm
Stage 2: Carbon dioxide content (CO
2
) or oxygen content (O
2
)
_____________ %
Stage 2: Carbon monoxide content (CO)
_____________ ppm
10. Casing fitted?
12. Control parameters checked?
11. System user instructed; documentation handed over?
12. Commissioning confirmed?
Yes
No
Date:
_____________
Signature:
_________________________