6. Transport, installation, start-up and putting out of operation
6.1 Transport
Transport the unit cautiously to its destination. For that purpose, make use of proper equip-
ment.
6.2 Unpacking
Lift the unit carefully from the packaging and place the unit on a stable as well as plane
support.
Note!
Consider that inside the unit and attached components according to
the bill of delivery there might be residues of blue-coloured test oil.
6.3 Installation
The unit is prepared for being mounted on wall or floor by means of two screws M6. The
mounting area has to be that stable to absorb the weight of the unit including the filled
cartridge.
In addition, make sure that the mounting surface is vertical and plane
.
Drilling pattern for wall mounting:
Drilling pattern for floor mounting
1)
:
1)
For bottom mounting the function control of
the piston pump is not possible. In the ver-
sion without function control the plug must
be removed before ground mounting.