Operation manual GMK-A
Page 19 of 35
B0887
6. Transportation, installation, commissioning and shutdown transport
6.1 Transportation
Transport the unit to its destination carefully and by using suitable aids.
6.2 Unpacking
Lift the unit out of its packaging carefully and put it on a stable and plane base.
Note!
The unit and the components attached in accordance with the
scope of delivery may still contain residues of blue-dyed test oil.
6.3 Installation
The unit is ready for wall-mounting. It is to be secured by means of two M5 screws at the
both female threads of the pump body. The device is screwed from the rear side. For this
purpose, through holes are required on the wall surface. The mounting surface must be
sufficiently stable in order to be capable of carrying the pump unit’s weight including the
filled reservoir.
Besides, it needs to be ensured that the mounting surface is vertical
and plane.
Drill scheme:
Alternatively, the optional mounting plate can be used. The mounting plate has through
holes. The plate can be attached to the pump body using the screws supplied. The pump
can then be mounted to the wall from the front of the unit using two M6 screws.
Drill scheme: