Maintenance
Original operation manual
HIGH PRESSURE CLEANER
HPC_BADBK_en_1805 • rs
33
6.1 Regular testing
The device must be regularly inspected and maintained by a specialist:
➤
prior to first commissioning,
➤
after changes to / the servicing of parts of the installation that affect
safety,
➤
after an interruption to operation lasting more than 6 months,
➤
although at least every 12 months.
In the case of devices that have been put out of use, the test can be
delayed until the next time commissioning takes place.
The results of the tests must be recorded in writing and stored until the
next test. The test certificate or a copy of this must be available at the
device's place of use
6.2 Maintenance schedule
It is necessary to collect residues of cleaning agents, oils, greases and
other chemical substances according to the legal regulations for recycling
or disposal. The official local waste water protection laws apply.
Time frame
Activity
For further reading
Prior to each
commissioning
Check release agent level
in the high pressure pump
Chap. 6.2.2 on page 35
1 time per week
Check and clean the
water separator (only for
pneumatically operated
high pressure cleaners)
Chap. 6.2.1 on page 34
Visual inspection of the
compressed air, hydraulic
and material hoses
Chap. 6.2.4 on page 36
Every 3 years
Inspection of the
compressed air, hydraulic
and material hoses by a
specialist and replacement
if necessary
Chap. 6.2.4 on page 36