background image

-12-

 

HOT AIR WELDER

This product has been manufactured and engineered to the highest performance standards and has 
been subjected to testing prior to shipment.

ONE YEAR WARRANTY

THE  WINSTON  GROUP  guarantees  this  product  against  defects  in  material  and  workmanship  for  a 
period of ONE YEAR from the established purchase date. The Winston Group. will repair or replace, 
free of charge, any defective parts determined to be covered under this warranty by factory authorized 
service personnel. Labor to install these parts will be supplied at no charge during this one year period.

The complete unit or defective module must be returned to a factory authorized service center, freight 
prepaid, preferably with a letter of explanation.

CONDITIONS

This warranty does not apply if the unit has been misused, altered, or used for any purpose other than 
in  accordance  with  the  operating  instructions  provided.  This  warranty  does  not  cover  transportation, 
exterior finishes, heating elements, silicone wheels, or carbon motor brushes.

Operation of these units with other than factory original parts shall render this warranty null and void.

This warranty replaces all other warranties expressed or implied.

Warranty

THE WINSTON GROUP LTD

1092 Carolina Drive, Suite 1, West Chicago, Illinois 60185
PHONE: 1-630-231-0419
FAX:1-630-231-0429
www.winstongroup.com

Summary of Contents for EAGLE V42-DD

Page 1: ...rd is included in the shipping box Please fill it out so that we can provide you any new product information or tips for better welding The serial number of your unit is located on the handle of the g...

Page 2: ...they are too unpredictable Even when they are dedicated circuits power spikes and drops can occur resulting in sub standard equipment operation A Minimum 7 500 Watt watt capacity for the generator pro...

Page 3: ...Check the distance between the vertical centerline of the compression roller and the tip of the nozzle The distance should normally be 21 4 21 2 55 60mm from the centerline of the roller 3 21 4 21 2 C...

Page 4: ...re roller should be positioned so that it rolls fully on the surface of the top sheet about 1 4 inside the edge of the shelf The edge of the roller should not hang over the edge to keep it from pickin...

Page 5: ...at the edge of the seam Usually about 10 FPM Feet per minute One revolution of wheel equals one foot of travel Increasing the temperature slowing the speed and increasing the pressure will all increa...

Page 6: ...nalysis should be performed at the beginning of a day s production and at any significant change in operating environment such as A ten degree F change in ambient temperature A significant change in c...

Page 7: ...cord or electrical connection Keep clear of the heat gun nozzle Exposed skin will burn upon contact Always heat seam in a well ventilated area Do not inhale fumes caused by the heat seaming process Do...

Page 8: ...wer motor for 3 4 seconds and observe the amount of sparks If sparks are larger than 1 16 consult the manufacturer Motor replacement may be needed 9 Unplug the main power and heatgun connectors and sl...

Page 9: ...tion 23 on the part sheet UNIT JERKING 1 Check for low voltage on the control box voltmeter See Fig 3 Should be 210 to 250 VAC 2 Check drive engage disengage gear lever 3 Increase speed setting slight...

Page 10: ...period The complete unit or defective module must be returned to a factory authorized service center freight prepaid preferably with a letter of explanation CONDITIONS This warranty does not apply if...

Page 11: ......

Page 12: ......

Page 13: ......

Reviews: