Winncare Medicalys MS4/C Manual Download Page 5

Although the bed is conforming with Electromagnetic Compatibility, some devices may alter how it functions, 
in which case they must be used at a distance or not used at all. 
The  bed  is  a  medical  device  and  must  not  be  modified  under  any  circumstances.  You  must  ensure  its 
traceability, including that of the boards and its accessories.  
If you are assembling medical devices not provided by the bed manufacturer, you must check the conformity 
of the assembly and make the CE declaration of the new medical device. 
 
The electric parts (jack, supply box, wired control, etc.) shall only be repaired by the manufacturer Linak. 
 
The bed is not suitable for use with an inflammable anaesthetic mixture with air or oxygen or nitrous oxide. 
 
The loads permitted (see bed characteristics) must be distributed evenly over the bed base. 
 
Do not activate all the motors at the same time when the patient is in the bed (only one motor is authorised at 
one time, except elevation by 2 motors or simultaneous function). 
 
After each use and while care is being administered to the patient, the brakes must be activated. 
We recommend putting the bed in its low position after every use and while the patient is resting, to reduce the 
height of falls by a confused or agitated person. Remember to lock the function(s) (if the option is available). 
 
On change of height or angle of the parts of the bed, make sure that there are no objects and no parts of the 
patient’s or carer’s body caught between the bed, the boards, the accessories and the ground or between the 
boards and base or between the cross braces. 
 
Do not sit down on the side of the back rest or leg rest if this is not flat. 
In the case of a prolonged more than 50 ° tilt bust semi-sitting position, it is recommended to vary the position 
of the person in bed every 2 hours. 
 
When the bed is being moved, keep the power lead well away from the ground and wheels. 
 
When  use  of  an  adaptor,  extension  lead  or  connection  plug  proves  necessary,  you  must  check  that  its 
characteristics are suitable for the bed. 
 
Connection  to  the  supply  box  must  be  done  using  a  mains  complying  with  the  standards  in  force  and 
corresponding to a voltage of use indicated on the device. 
 
The mains plug must be disconnected before the bed is moved. 
 
Do not pull on the mains leads to disconnect the mains plug. 
 
During any handling, try not to catch the leads of the motors and remote control and do not get them knotted. 
 
The wired control must be hooked to the headboard when not in use. 
In the case of the use of infrared remote control(s), WINNCARE allows the establishment of a single bed in the 
same room (or in a close environment) or a second bed only if the infrared options of 2 beds concerned are 
different (I 

and

 I1). 

 
The condition of the leads must be checked frequently. If the slightest modification is observed, the person in 
charge for maintaining the bed must be contacted to carry out the necessary repairs. 
 
If repairs are required, the person in charge of maintenance must be contacted. 
 
For greater safety, some side rails can be adapted (see accessories). 
Side rails should not be used to manipulate or move the medical bed. 
To assist patient mobility, it is possible to fit a Mobility Aid System (S.A.M.

). 

 
For  assistance,  if  necessary,  in  mounting,  operation  or  maintenance  or  to  report  unexpected  operation  or 
events, call your supplier or Winncare. 
The cleaning instructions recommended must be complied with. 

 

Summary of Contents for Medicalys MS4/C

Page 1: ...du Ch teau 85670 SAINT PAUL MONT PENIT TEL 33 0 2 51 98 55 64 FAX 33 0 2 51 98 59 07 Email info medicatlantic fr Site Internet http www winncare fr MEDICALYS 2i me GENERATION MS4 P C R 2020_02_11 5802...

Page 2: ...4 TECHNICAL CHARACTERISTICS 13 6 4 1 DIMENSIONS 13 6 4 2 WEIGHT 14 6 4 3 NOISE 14 6 5 ELECTRICAL CONNECTION DIAGRAM 14 6 6 REMOTE CONTROL 15 6 6 1 MOBILE CARER CONTROL ACO OPTION 16 6 7 CENTRALIZED BR...

Page 3: ...TILT AND OR RELEASE OF THE TRENDELEBURG OPTION 24 9 3 BATTERY 25 10 MAINTENANCE 26 10 1 IDENTIFICATION 26 10 2 INSTRUCTIONS FOR DISMANTLING THE MOTORS 26 10 3 MAINTENANCE 27 10 4 QUALITY INSPECTION O...

Page 4: ...ANSPORT AND STORAGE For transport the bed should be in its low position on a pallet and strapped and protected The wired control and supply lead should be attached to the bed base The head and footboa...

Page 5: ...f the back rest or leg rest if this is not flat In the case of a prolonged more than 50 tilt bust semi sitting position it is recommended to vary the position of the person in bed every 2 hours When t...

Page 6: ...n the designated room foreseeing an appropriate perimeter of use for the different functions variable height TR etc especially if the bed has a lifting pole or side rails Check that there is sufficien...

Page 7: ...quid penetration Index 1st number decade Protection against solids 2nd number unit Protection against water intrusion 0 No protection No protection 1 Protected against solid bodies greater than 50 mm...

Page 8: ...3 2 Class A Voltage fluctuations Flicker EN 61000 3 3 Compliant RF emissions CISPR 14 1 Not Applicable The medical bed see references in contents has not been designed for connection to other equipmen...

Page 9: ...810 870 930 Pulse Modulation 18 Hz 28 1720 1845 1970 Pulse Modulation 217 Hz 28 2450 Pulse Modulation 217 Hz 28 5240 5500 5785 Pulse Modulation 217 Hz 9 3 2 4 Equipotentiality Under the head half of...

Page 10: ...mum Item L 90cm L 100cm MEDIDOM II 2 4 P318 00 P323 00 MEDIDOM II HOTELIER 4 6 P326 00 COTE DE LUMIERE 5 P360 00 DAGONE 5 P388 00 ELEGANTTI P414 00 LOUIS PHILIPPE 1 2 P415 00 COTE DE LUMIERE with wood...

Page 11: ...kit NA A627 00 Transport kit Transtolit NA A633 00 M dicalys wall stop NA A634 00 Kit for side loading bed NA A637 638 00 EPOXY side rail NA A639 640 00 Chrome barrier NA A645 646 00 S A M EVOLUTION...

Page 12: ...version DANGER RESULT REQUIREMENTS FOR THE USER Trapping Hands pinched Handle legsrest or backrest up by handles or at specified locations Trapping Crushing body or object Before lowering the bed che...

Page 13: ...ls Height lower position Height top position Height under base for lifter or dinner table 12 5cm 37cm 86 5cm 14 5cm 15cm 39 5cm 89cm 17cm Forward slant 17 Back slant 12 5 223 5cm 105 5cm 672 mm 947 mm...

Page 14: ...n electric folding leg rest and back forward slant without boards 120 kg 6 4 3 Noise The measurement of the maximum audible sound power in accordance with ISO 3746 is 53 dB A 6 5 Electrical connection...

Page 15: ...tions Lifting and lowering of back rest Lifting and lowering of variable height Lifting and lowering of electric folding Simultaneous lifting and lowering of back rest and folding KEY IN VERTICAL POSI...

Page 16: ...ack variable height leg rest back tilt forward tilt press the key key and the key for the function to be locked Make the same thing to unlocked a function Back rest Chair position fauteuil Leg rest Lo...

Page 17: ...17 12 6 7 Centralized Braking 6 1 Emergency declination 6 1 1 Positioning of the emergency declination 6 1 2 Resetting the box spring...

Page 18: ...rest handle with one hand Push or lift to compensate the pressure exerted by the patient and unhook the clip by the connecting rod with the other hand The back rest jack will then pivot downwards d Pu...

Page 19: ...suscitation 7 2 Leg rest 7 2 1 Leg rest with manual crank C To lift lift the leg rest using the handle at the end To lower relieve the leg rest slightly or to its maximum with the hand to release the...

Page 20: ...To positionning the side rail Insert amount of the side rail folded in the grip jaw on the head side of the bed to hear CLIC Tighten the Rondo screws of the grip jaws on the bed base To remove the sid...

Page 21: ...th both hands until it locks Check that it is properly slot in To lower the side rail Raise the top side rail with one hand Press on the unlocking button with the other hand Support the rail as it low...

Page 22: ...op side rail with both hands until it locks Check that it is properly slot in by trying to get it down without using the unlocking buttons 2 In high position Raise the top side rail with both hands to...

Page 23: ...l Press on the two unlocking buttons with both hands Support the rail as it lowers 8 5 Angled lifting pole and IV stand In case of psycho behavioral problems of the patient it is necessary to fix the...

Page 24: ...ired position In the event that the mattress was in Trendelenburg position electric after pressing the pedal it is mechanically disengaged until the horizontality of the mattress Always free the actio...

Page 25: ...r the first time The purpose is to have batteries in their maximum state of charge and hence increase their service life Storage conditions These must be recharged if the date of production indicated...

Page 26: ...ls Put the motors back in place and put in the same direction as at the beginning Maximum patient weight Warning refer to user s manual Safe operational load Safety clip No maintenance should be done...

Page 27: ...ication that the electrical leads are connected all along the metal jambs to prevent shearing of these leads when the variable height is being activated Verification that all of the electrical leads a...

Page 28: ...controls displays lights and locking Bed specific side rails Space between head of bed and siderail 60 mm Space between the half siderails 60 ou 318 mm Condition mounting direction adaptation to bed M...

Page 29: ...ed according to the disinfectant manufacturer s instructions the drying time without human presence is often the same as the remanence time Refer to the instruction manual SANIVAP steam appliance with...

Page 30: ...ntenance is 8 years for beds and 5 years for accessories and boards 10 7 Garanties All of our products carry a warranty against any manufacturing defect provided the normal conditions for use and main...

Page 31: ...osition on wheels normal event Press down on the variable height to remove the wheels normal use The selected function of the bed does not work The function is locked on the remote control Unlock the...

Page 32: ...ments of the Winncare product are considered to be Electrical and Electronic Equipment EEE subject to EU Directive 2012 19 EU on the Selective sorting of electrical and electronic waste DEEE batteries...

Reviews: