INSTALLATION
Please refer to the contract arrangement and site instructions as applicable.
It is recommended that a concrete foundation (to take foundation bolts – not
supplied) should be provided for the machine to be mounted on
Before completing the installation, check that the main mixer frame is level
with a spirit level. Packings should be inserted as required under the main
frame. Check that the pan is seated and that the pan rack and drive gear are in
mesh.. Also check that all the blade clearances are in line with the maintenance
instructions.
On connecting to the power supply, the wiring diagram must be referred to.
N
ote:- it is recommended that the mains electrical supply is taken via an
earth leakage circuit breaker.
The wiring is correctly connected to the motors when the pan and star drive
rotate as follows:-
•
The mixing pan and mixing star rotate anti-clockwise when looking from
the top.
NOTE:- the proximity sensors below the pan and star drive lifting
mechanism are fitted with small LED’s which light up when the sensors
are operating correctly.
Summary of Contents for CUMFLOW RP150XD MK2
Page 2: ......
Page 5: ...OPERATING AND MAINTENANCE MANUAL SECTION 1 GENERAL INFORMATION RP150XD MK2...
Page 6: ......
Page 13: ...INSTALLATION DRAWING...
Page 14: ...OPERATING AND MAINTENANCE MANUAL SECTION 2 INSTALLATION AND OPERATING INSTRUCTIONS...
Page 15: ......
Page 23: ...OPERATING AND MAINTENANCE MANUAL SECTION 3 TECHNICAL SPECIFICATION AND MAINTENANCE...
Page 24: ......
Page 30: ...LUBRICATION CHART...
Page 31: ...OPERATING AND MAINTENANCE MANUAL SECTION 4 MIXER SPARE PARTS...
Page 32: ......
Page 34: ...RP150XD MK2 MIXING PAN DRIVE...
Page 36: ...RP150XD MK2 STAR DRIVE ASSEMBLY ASSEMBLED LENGTH OF COUPLING ITEM 3 ON SHAFTS IS 73MM...
Page 39: ...RP150XD MK2 MIXING STAR ASSEMBLY...
Page 41: ...RP150XD MK2 MIXING STAR LIFTING ARRANGEMENT...
Page 43: ...RP150XD MK2 COVERS GUARDS...
Page 46: ...PAGE INTENTIONALLY BLANK...
Page 49: ...RP150XD MK2 DECALS AND LOGOS CROKER CUMFLOW RP150XD 1 2 4 5 6 7 8 9 10 11 12 13...
Page 51: ...OPERATING AND MAINTENANCE MANUAL SECTION 5 ANCILLARY EQUIPMENT SPARE PARTS...
Page 52: ......
Page 53: ...RP150XD MK2 FOUR WHEEL PAN TROLLEY...
Page 56: ......
Page 57: ...OPERATING AND MAINTENANCE MANUAL SECTION 6 ELECTRICAL SYSTEM...
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ...WINGET 04B dwg 04 03 03 16 09 48 Scaled to fit...
Page 64: ...WINGET 04C dwg 04 03 03 16 10 57 Scaled to fit...
Page 65: ...WINGET 04A dwg 04 03 03 16 08 44 Scaled to fit...
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ...OPERATING AND MAINTENANCE MANUAL SECTION 7 MISCELLANEOUS...
Page 86: ......