
26
2.
For the Installer
2.4.11 InfoWINplus and switch cover
– Push the InfoWIN cable and grommet into the slot in the control panel cover. Hook rear of cover into place and
secure it at front with 3 self-tapping screws – Fig. 65.
– Mount the InfoWINplus (attached) to the switch cover using the 4 screws to do so and secure the InfoWIN cable
to the strain relief lug with cable ties – Fig. 66.
– Connect the InfoWIN cable – Fig. 67.
– Hook the switch cover into place and secure with 2 self-tapping screws at the back of the cladding – Fig. 68.
2.4.12 Cladding cover
– If the flue connection is at the top, punch out the cut-out on the cladding cover – Fig. 69. If the flue connection is
at the rear, do not punch out.
Punch out cladding cover = flue connection at top
Do not punch out cladding cover = flue connection at rear
– Place the cladding cover on the boiler – Fig. 70.
Fig. 65 Mount the control panel cover,
fitting insulation at rear
Fig. 66 Screw InfoWINplus into the switch cover and
secure cable with cable ties
3 x
Fig. 67 Connect the InfoWIN cable
Fig. 68 Screw the switch cover into place
2x
InfoWIN cable
with grommet
Cable tie
4 x
3,5x10
Fig. 69 Punch out cut-out only if flue
connection is at top
Fig. 70 Fitting the cladding cover
fitting insulation
at rear