clean 'break before make' action in the transfer switch.
The restoration of line power also sends a stop signal to the
engine generator set.  This stop signal will activate the 5 minute
timer circuit and shut down the unit 5 minutes later.

This completes your installation and unit testing.  ALWAYS leave
the system in standby mode unless servicing the unit. For
standby operation, keep both the generator set and transfer
selector switches in the “AUTOMATIC” position.

SETTING THE EXERCISER CLOCK

Setting the current time and date.

1.

Position the top right hand (RUN) slide switch to the left

position.

2.

Push the clock's "Day Select Button" until the clock displays

a triangle under the number corresponding to the current day of
the week. (Monday is day 1, Sunday is day 7)

3.

Push the "Hour Select Button"  until the display indicates the

correct hour. Note: For PM be sure there is a "P" displayed
beside the correct hour.

4.

Push the "Minute Select Button" until the display indicates

the correct time in minutes.

5.

Position the top right hand (RUN) slide switch to the center

position.  The correct time and date should now be displayed.

Setting the Exerciser Program:

NOTE:  The programs on this clock are grouped. i.e. 1 and 2, 3
and 4, etc.  The start time is programmed on the odd number and
the stop time is programmed on the even number in each
program set.

1.

Position the top right hand (RUN) slide switch to the right

hand position.

2.

Position the top left hand (AUTO) slide switch to the center

position.

3.

Press the "Program Select Button" until No 1 is displayed on

the clock to the right of the time.

4.

Push the "Day Select Button" to select the day you want the

engine generator set to start up and run.  Note:  You can get
more than one triangle displayed on the clock. If this happens just
keep pressing the button and it will work back through the cycle
and display only one triangle under whichever day you desire.

5.

With the "Hour" and "Minute" buttons select the time of day

you want the engine to start up.

6.

Press the "Program Select Button" until number 2 is dis-

played on the clock.

7.

Push the "Day Select Button" to select the day you want the

engine to stop.  This must be the same day you  selected in step
4 above.

8.

With the "Hour" and "Minute" buttons, select the time you

want the engine to stop.  It is recommended you let the engine
run at least 15 minutes during any exercise period.

9.

Position the top right hand (RUN) slide switch to the center

(RUN) position.

CLOCK NOTES:

This seven day exerciser clock has seven additional program
cycles available.  Always keep in mind the odd number turns the
unit on and the even number shuts the unit off.  (i.e. (3 on, 4 off)
(5 on, 6 off) etc.

The relay in the clock will not work unless the transfer switch is
installed and powered up.  The clock relay needs 120 volts AC to
operate.

If, when you finish programming the clock, you get an EEEE on
the display, it stands for error.  The most common error is that the
day of operation has not been properly set at each step or a
program has been turned on and not turned off. i.e. programs not
properly grouped 1& 2, 3 & 4, 5 & 6, etc.

On the face of the clock is a small button marked "R". This is a
reset switch.  Depressing this switch will remove all programming
in the clock including the time. Use a small screwdriver or the tip
of a pencil to depress this button.  This should be used only as a
last  resort.

TROUBLESHOOTING TABLES

UNIT WILL NOT CRANK WHEN THE POWER FAILS.

1.

Digital Genset Controller not in "AUTO"

2.

Transfer control switch not in "AUTOMATIC"
position.

3.

Incorrect wiring between transfer switch and
generator.

4.

Defective start stop relay in the transfer
switch.

5.

Circuit breaker tripped on Digital Genset Controller.

6.

Defective Digital Genset Controller

7.

Loose or dirty battery terminals.

8.

Defective "Run/Auto" switch on generator or
transfer switch.

9.

Defective starter.

10.

Defective start solenoid.

ENGINE WILL NOT CRANK WITH GENERATOR
RUN PUSH-BUTTON DEPRESSED.

1.

Battery dead.

2.

DC circuit breaker for Digital Genset Controller
tripped.

3.

Defective Digital Genset Controller.

4.

Loose or dirty battery terminals.

5.

Defective "Run/Auto" switch on generator.

6.

Defective starter.

7.

Defective start solenoid.

8.

Locked up engine genset.

Summary of Contents for PSS50LC

Page 1: ...ine Generator Set 225 SOUTH CORDOVA AVE LE CENTER MN 56057 507 357 6831 PACKAGE STANDBY SYSTEMS PSS50LS C PSS75LS A INSTALLATION AND OPERATIONS MANUAL for UNITS EQUIPPED WTH BASLER DIGITAL GENSET CONTROLS ...

Page 2: ...ed electrician Operated only for its designed purposes Used only by operators who understand its operation Properlymaintained Read and understand all instructions in the manual before starting and operating the generator set USING THIS MANUAL Congratulations on your choice of a Winco generator set You have selected a high quality precision engineered generator set designed and tested to give you y...

Page 3: ...rts They all can cause severe burns instantly f Installing a generator set is not a do it yourself project Consult a qualified licensed electrician or contractor The installation must comply with all national state and local codes g Always make sure unit is disabled before placing your hands anywhere near the fan belts alternator or water hoses SAFETY INFORMATION This engine generator set has been...

Page 4: ...cessary to send a start stop signal to the engine generator set 2 ENGINE GENERATOR PSS50LS The engine generator set consists of a GM 5 7L V 8 industrial liquid cooled engine equipped to run on L P N G fuel The engine operates at 1800 rpm and frequency regulation is maintained by the electronic governor within 5 cycles variation from no load to rated load The 50 000 watt 50kW generator is a single ...

Page 5: ...er Failure Enabled Magnetic Pickup Failure Enabled During normal operation the DGC will continuously display the engine oil pressure coolant temperature and the battery voltage reading By pressing the Phase Toggle push button you can toggle through the different phases checking the generator output and amperage reading on each phase The DGC has three operational push buttons You can tell which pos...

Page 6: ...it under the unit may cause the unit to overheat from lack of proper air flow Before beginning the installation process recheck the rating of the generator set and its transfer switch rating Be certain they can handle the intended load and are compatible with the entrance voltage phase and current ratings Plans for installation should be prepared with proper attention to mechanical and electrical ...

Page 7: ...ange the fuel type in the field see information on page 10 Line Size vapor system Unit location will determine the size of fuel line that is required to supply the engine with a constant fuel pressure Refer to the tables below for fuel line size fuel consumption and recom mended tank size For distances of 25 feet and over a two regulator fuel system is recommended This is accomplished by installin...

Page 8: ...e damage to both the engine and the engine control module Observe polarities Connect the positive battery terminal to the cable from the control panel the negative battery terminal is connected to the negative cable ground from the engine generator assembly NOTE Always make sure that a new battery is fully charged before installing it on a generator set Failure to do so can cause damage to the eng...

Page 9: ... instruments before proceeding A C ELECTRICAL CONNECTIONS WINCO Non UL Only Single Phase The standby generator terminals in the A T S are marked GENERATOR G1 G N G3 The hot leads G1 and G3 wire directly to the top lugs on the generator side contactor terminals G1 and G3 The G N connection is made to the lug on the standoff just to the right of the generator side contactor The line terminals in the...

Page 10: ...ed under emergency power failure conditions an additional distribution panel designated emergency distribution panel must be installed All selected emergency circuits are removed from main distribu tion panels and installed in the emergency distribution panel The A T S is then installed between the main panel and the emer gency distribution panel Suggested circuits freezer refrigerator furnace eme...

Page 11: ...he same as it was on the generator front panel The voltage should also be checked between the hot terminals G1 and G3 and the G N to be certain of a balanced voltage output and a solid neutral connection The voltage between G1 and G N should be about 120 volts AC 277 on 480 units The same approximate voltage should be found between terminals G3 and G N 120 volts AC On three phase panels the G2 vol...

Page 12: ...tart up 6 Press the Program Select Button until number 2 is dis played on the clock 7 Push the Day Select Button to select the day you want the engine to stop This must be the same day you selected in step 4 above 8 With the Hour and Minute buttons select the time you want the engine to stop It is recommended you let the engine run at least 15 minutes during any exercise period 9 Position the top ...

Page 13: ...ror between generator and transfer switch 5 Defective start stop relay ATS PANEL WILL NOT RETRANSFER TO NORMAL POWER 1 Proper normal line power not available at line terminals in ATS panel 2 Defective holding coil in line side contactor 3 Broken or defective mechanical electrical interlocks 4 Defective start stop relay NO AC OUTPUT FROM GENERATOR 1 Defective diode 2 Defective voltage regulator 3 D...

Page 14: ...E LOW WYE 120 208 VOLTS THREE PHASE HIGH WYE 277 480 VOLTS Lead Cross Ref U L1 V L2 W L3 N N U1 T1 U2 T4 U5 T7 U6 T10 V1 T2 V2 T5 V5 T8 V6 T11 W1 T3 W2 T6 W5 T9 W6 T12 Lead Cross Ref U L1 V L2 W L3 N N U1 T1 U2 T4 U5 T7 U6 T10 V1 T2 V2 T5 V5 T8 V6 T11 W1 T3 W2 T6 W5 T9 W6 T12 ...

Page 15: ...ELTA SINGLE PHASE AC WIRING SINGLE PHASE 120 240 VOLTS THREE PHASE DELTA 120 240 VOLTS Lead Cross Ref U L1 V L2 W L3 N N U1 T1 U2 T4 U5 T7 U6 T10 V1 T2 V2 T5 V5 T8 V6 T11 W1 T3 W2 T6 W5 T9 W6 T12 Lead Cross Ref U1 L1 U6 L3 N N U1 T1 U2 T2 U5 T3 U6 T4 ...

Page 16: ...Page 14 3113 00 60706 156 VOLTAGE REGULATOR WIRING THREE PHASE AND SINGLE PHASE ...

Page 17: ...60706 156 Page 15 3113 00 DC SCHEMATIC ...

Page 18: ...Page 16 3113 00 60706 156 PSS50 75LS OUTLINE DRAWING AND WIRING ENTRANCE ...

Page 19: ...l warranties including those of merchantability and fitness for a particular purpose are limited to 12 months from date of purchase In no event is WINCO liable for incidental or consequential damages Note Some states do not allow limitation on the duration of implied warranty and some states do not allow the exclusion or limitation of incidental or consequential damages so the above limita tions m...

Page 20: ...225 SOUTH CORDOVA AVE LE CENTER MN 56057 Phone 507 357 6831 Fax 507 357 4857 Website www wincogen com 60706 156 3113 00 ...

Reviews: