background image

13

REV B

OPM-111

INITIAL START UP

WARNING: EQUIPMENT DAMAGE:

Before attempting  to start this unit, complete your pre-start checklist 

and ensure the generator mainline circuit breaker is in the proper 

position prior to starting. Starting this unit without it properly connected 

can cause serious personal injury or equipment damage.

DO NOT jump start these engine-generator sets. Starting these units 

on a low battery or jump starting them will cause damage to the engine 

control module. 

Use the following check list to verify correct installation before starting 

the engine.

  □

 Engine oil. Fill as required with proper grade/qty.

  □

 Engine coolant. Fill as required with proper mixture.

  □

 Unit mounting base properly bolted down.

  □

 Clearance for service and maintenance on all sides.

  □

 Proper fuel line material and size.

  □

 All fuel line connections tight.

  □

 Battery connections clean and tight

  □

 Battery fully charged.

  □

 All AC and DC wiring installed and properly protected.

  □

 Compressor oil. Fill as required with proper grade/qty.

After completing the previous checklist, the engine-generator set is 

ready for initial start-up. 

MANUAL MODE

1. Press and release the MANUAL MODE button. The small LED light 

next to it should come on. 

Note:

 There is no start delay in this mode of operation.

2. Press and release the green START ENGINE button. The DSE 7310 

MKII will send two signals to the engine. The first signal wire #21 will 

engage the fuel solenoid, the second wire, #22, will engage the starter 

on the engine. At this point the DSE7310 will start the cranking cycle 

(10 seconds on and 10 seconds off).

Note:

 Wire #93 is energized to turn on the glow plugs for 15 seconds 

first and then the starter and fuel solenoid are engaged.

If the engine fails to start during this cranking period, the starter motor 

is disengaged and goes into a rest mode after which a second attempt 

is made to start the engine. Should this sequence continue through 3 

cranking cycles the start sequence will be stopped and the display will 

show ‘FAILED TO START”. 

3. During manual operation, the load will not normally be applied to the 

generator. But caution must be used, if the line power should fail or be 

turned off the transfer switch during manual operation the load may be 

applied to the generator.

With the engine running smoothly check the no load voltage and 

frequency on the digital display. The voltage should be 208/240/480 AC 

depending on which model you have and a frequency of 59.5 to 60.5 

hertz (Hz). 

If you have the proper voltage at the generator the next step is to 

check the voltage at the generator terminals in the Automatic Transfer 

Switch. The voltage between the G1 and the G3 terminals should be 

the same as it was on the generator front panel. The voltage should 

also be checked between the hot terminals (G1 and G3) and the G-N to 

be certain of a balanced voltage output and a solid neutral connection. 

The voltage between G1 and G-N should be about 120 volts AC (277 

on 480 units). The same approximate voltage should be found between 

terminals G3 and G-N (120 volts AC).

On three phase panels the G2 voltage level should also be checked. 

ON 240 VOLT (DELTA) SYSTEMS BE SURE YOU KNOW WHERE 

THE HIGH VOLTAGE “WILD” LEG IS. IT MUST BE IN THE SAME 

LOCATION ON THE LINE SIDE AS IT IS ON THE GENERATOR SIDE. 

(i.e. if it’s on L-3 on the line side it must be on G-3 on the generator 

side.

 Also on three phase systems make sure that the rotation 

is the same on the generator as it is on your line power. Failure 

to insure proper rotation will cause three phase motors to spin 

backwards possibly damaging them.

NOTICE:

If for any reason during the check out procedure the voltage and 

frequency are not correct, depress the STOP/RESET button and 

correct the trouble before proceeding.

4. Stopping - There are two ways to stop the unit when it is in the 

manual mode. Pressing the STOP/RESET button will stop the unit 

immediately. Pressing the AUTO mode button will stop the unit but only 

after the cool down timers have timed out and there is no remote start 

signal being sent to the unit.

AUTO MODE

To activate the automatic start mode you will just need to depress the 

AUTO button, the LED indicator beside the button confirms that the unit 

is in automatic mode.

To test the Automatic Transfer Switch, follow the instruction on the 

operator’s manual that came with the transfer switch. If you get a fault 

during the initial start up or prior to start up, it is most likely a false 

warning light. Simply reset the ATS start over.

Once you have completed testing of the ATS, be sure you ALWAYS 

leave the system in the standby mode,unless servicing the unit. For 

standby operation, press the AUTO button on the front of the control. 

The green light should light up next to the AUTO button.

NOTE: For setting the exerciser circuit, for all ATS, see the operator’s 

manual shipped with the ATS. 

Summary of Contents for PSS21/F

Page 1: ...WINCO INC 225 S CORDOVA AVE LE CENTER MN 56057 507 357 6821 SERVICE DEPT 507 357 6831 www wincogen com INSTALLATION AND OPERATORS PSS21 F PSS30 F GENERATOR MANUAL...

Page 2: ...ting instructions in this manual Should you experience a problem please follow the Troubleshooting Tables near the end of this manual The warranty listed in the manual describes what you can expect fr...

Page 3: ...d container and only in a well ventilated area F Follow local codes for closeness to combustible material 3 DEADLY EXHAUST GAS Exhaust fumes from any internal combustion engine contain carbon monoxide...

Page 4: ...er Rotor L N 0 106 Ohms Per Ph 22 C Exciter Stator L N 15 42 Ohms 22 C Aux Winding 2 570 Ohms 22 C Voltage Regulator L N AS540 PSS30 F LP Gas Wattage 30 000 30 000 30 000 30 000 Volts 120 240 120 208...

Page 5: ...osure for outside installation Connection boxes are provided to all customer connections both AC output and DC control A customer supplied 12 Volt 650 CCA BCI group 24 battery is required to complete...

Page 6: ...high as long as they are structurally sound supporting the weight of the unit and preventing movement during operation The mounting holes on the base of this unit is 0 625 in diameter The engine gene...

Page 7: ...ructions in the regulator or fuel valve The results could range from inoperative engine to hazardous fuel leaks CAUTION Be careful when sealing gas joints Excessive sealing compound can be drawn into...

Page 8: ...11 in 4 6 oz 7 11 in 4 6 oz No load Line PSI 7 11 in 4 6 oz 7 11 in 4 6 oz Full load Line PSI 7 11 in 4 6 oz 7 11 in 4 6 oz Two regulator system LP vapor only Ref 1 2 3 4 Unit off Line PSI 10 15 lbs...

Page 9: ...negative battery terminal is connected to the negative cable ground from the engine generator assembly All connections must be clean and tight Check the electrolyte fluid in the battery periodically...

Page 10: ...rovided in the control box GROUNDING A grounding lug has been provided on the engine generator set Check your local codes for proper grounding requirements AC ELECTRICAL CONNECTIONS NOTICE CLASS 1 WIR...

Page 11: ...ring instructions can be provided It is recommended that only copper wire be used In all cases it is essential that while the load is connected to the generator there can be absolutely no feedback fro...

Page 12: ...ints in the ASCO 300 ATS are terminals DQG HSHQGLQJ RQ WKH VL H RI WKH VZLWFK WKH DUH located in different locations TB7 removable terminal block TB7 4 TB7 5 TB7 6 1 2 3 4 5 6 7 8 9 Figure 4 TB7 gener...

Page 13: ...ency on the digital display The voltage should be 208 240 480 AC depending on which model you have and a frequency of 59 5 to 60 5 hertz Hz If you have the proper voltage at the generator the next ste...

Page 14: ...ect speed 7 Defective ECU on the engine ENGINE WILL NOT COME UP TO SPEED AFTER IT STARTS 1 Insufficient fuel volume getting to the unit a Fuel line too small b Low fuel pressure 2 AC short circuit 3 D...

Page 15: ...elector switch on the engine generator is in the off position If you are working in the Automatic Transfer Switch confirm with a reliable meter that all power has been disconnected AUTOMATIC TRANSFER...

Page 16: ...16 REV B OPM 111 PSS21 AND PSS30 OUTLINE DRAWING ENCLOSED OPEN SKID...

Page 17: ...H AND LOW WYE THREE PHASE LOW WYE 120 208 VOLTS THREE PHASE HIGH WYE 277 480 VOLTS THREE PHASE HIGH WYE 277 480V THREE PHASE LOW WYE 120 208V THREE PHASE DELTA 120 240 VOLTS THREE PHASE AC WIRING DELT...

Page 18: ...111 ENGINE HARNESS SCHEMATIC 6 1 6 1 1 3 6 237 21 2 22 17 6 1625 3 8 3 8 1 1 8 8 62 12 6 67 57 200 1 8 6 7 1 7 21 1 2 1 5 9 51 3 5 0 0 7 6 5 1 217 16 35235 7 5 1 250 7 21 21 1 72 1 2 81 87 25 86 6 35...

Page 19: ...7 1 1 77 77 1 5 7 50 1 2 6 211 725 211 725 66 86 86 86 86 86 36 1 2 8 1387 20021 6 5 1 1 6 5 1 1 1 1 1 36 32 5 6 7 66 0 5 1 6723 6 7 66 8 6 7 21 6 7 9 5 92 7 8670 17 5 267 7 9 5 1 855 17 66 7 50 1 2 8...

Page 20: ...enance consumables or labor This warranty only covers travel time that has been pre approved by the WINCO Service Department Mileage or labor for removal or re installation of WINCO product from its a...

Reviews: