T h e n o n - c o n t a c t W C - c o n t r o l
P R O D U C T P R E S E N T A T I O N
Remove standard bearing block out of the
flushing cistern.
Install distance bolt, push botton rod and backing
board; lead through the cable of the motor lifter
resp. the power supply (only 12V type).
Install mounting frame and adjust push botton bolt.
1
4
5
2
Insert bearing block with integrated motor lifter.
3
SanTec FLUSH
Page 7
Installation
Exchange pull clamp - remove the blue clamp and
insert the black one.
Mount fixing clamp for push bolt.
6