background image

WILO SE 02/2016

English

delivery manifold, 18 and 24 litre capacities (Fig.
1), just beside the booster for higher capacities.

- The existing pipes must be installed free from

stresses. Compensators or flexible connecting
pipes are recommended for this purpose in order
to avoid stresses on the pipe connections and
minimise the transmission of vibrations to the
building installation.

Connection to public water supply

Be sure the installation can withstand the maxi-
mum pump pressure at zero flow plus the public
water mains pressure. Otherwise connect the
pressure relief valve to the booster outlet.
We recommend to install a pressure relief and
regulating valve on the booster inlet, on the
water supply inlet to avoid any pressure varia-
tions at the booster inlet.

Connection on load to a tank

Be sure the installation can withstand the maxi-
mum pump pressure at zero flow plus the public
water mains pressure. Otherwise connect the
pressure relief valve to the booster outlet behind
the tank.

Connection on suction to a tank

Be sure that the losses of head do not exceed the
suction capacity of the pumps. It is recommend-
ed to use a foot-strainer valve with a pipe whose
dimension is equal to or higher than the suction
nominal diameter.

7.4 Electrical connection

WARNING!

The electrical connection must be

performed according to the local regulations by
an electrical installation engineer approved by
the local utility.

To make the electrical connection, the corre-
sponding installation and operating instructions
and attached electrical circuit diagrams must be
observed. General points to be considered are
listed below:

• the type of current and voltage of the mains

connection must comply with the data on the
type plate and the circuit diagram of the control
unit.

• as protection measure, the booster must be

earthed according to the regulations (i.e. accord-
ing to the local regulations and circumstances) ;
the connections intended for this purpose are
identified accordingly (see circuit diagram).

Power supply cable

The electric supply cable shall be correctly
dimensioned according to the total booster
power (see type plate).
Connecting the control box on a voltage differ-
ent from the one mentioned in the description is
not possible (see chapter 5.2. technical data).

NOTE: for any further details an electric diagram
is available inside the control box.

ATTENTION!

Do not forget to connect the earth

terminal.

Lack of water protection

An input ON/OFF (250V 2A) (Fig. 5) protects the
booster against lack of water, a pressure switch
(Normally Open) or a float switch shall be con-
nected to this input.

ATTENTION!

Do not apply external voltage to the

terminals.

8. Commissioning

ATTENTION!

Never let the booster run as dry

over a few seconds. Dry running may damage the
mechanical seal.

Before switching on for the first time, check that
the customer's wiring has been done correctly,
particularly the earthing.

ATTENTION!

Tighten all the supply terminals

before starting the booster.

8.1 Tank inflating

With no water in the tank pressurize the tank to
a pressure 0.3 bar lower than the starting pres-
sure of the pumps.

ATTENTION!

Do not exceed the maximum value

of tank first-inflating.

8.2 Filling - Degazing

Connection to public water supply or on load to

a tank

- Check the water supply origin (adequate water

level in the tank).

- Open the booster supply valve to get water

inside.

- Open the filling plugs (Fig. 1, pos. 5) of the

pumps and wait as long as water is getting inside
before closing them again.

- Keep the switch (Fig. 2, pos. 4) on "HAND" to

check priming. If need be test the pumps one
after the other.

Connection on suction to a tank

- Close the delivery valve.
- Open the suction valve.
- Screw off the filling plugs and remove them.
- With a funnel placed inside the port, fill in slowly

and completely the pumps and the suction pipes.

- After water and air exit, filling is finished.
- Screw on the filling plugs (Fig. 1, pos. 5).
- Set the switch (Fig. 2, pos. 4) on "HAND" to

check priming. If need be test the pumps one
after the other.

8.3 Motor sense of rotation

The electric connection of the pumps to the
control box is performed in the factory.
Nevertheless in case of three-phase version, you
shall check the right sense of rotation as follows:

- Be sure there is water inside the booster.
- Position the pump switches (Fig. 2, pos. 4) on

"OFF".

- Disconnecting switch ON.

7

Summary of Contents for Wilo-COE-2-MHIL

Page 1: ...6 Ed 4 2016 02 Wilo en Installation and operating instructions fr Notice de montage et de mise en service it Istruzioni di montaggio uso e manutenzione es Instrucciones de instalaci n y funcionamiento...

Page 2: ...Fig 1 Fig 2 Fig 3 Fig 4 Fig 5 10 1 2 3 8 9 6 4 5 7 11 4 2 3 5 1 1 3 1 1 2 Fig 6 Fig 7 3 2 5 6 4 2...

Page 3: ...sentenza Presi n desconectada Sem press o 0 0 1 2 3 4 5 6 7 8 9 10 1 1 3 0 3 3 6 10 6 2 3 4 5 6 7 8 9 10 11 12 0 3 0 9 1 8 5 2 2 3 4 5 6 7 1 3 4 6 4 12 bars 10 15 bars Pression arr t Off pressure Pres...

Page 4: ...tant pump or machinery functions failure of the maintenance and repairing process recommended danger to persons due to electrical mechanical and bacteriological influences material damages 2 4 Safety...

Page 5: ...iameter 6 Description and operation 6 1 General description The booster is a compact installation that is sup plied completely piped up and ready to connect The only connections that have to be made a...

Page 6: ...Position O The pump is OFF Position HAND The pump is operating in contin uous mode as long as the switch is maintained in this position When releasing it the switch is back to position O Position AUTO...

Page 7: ...ectly dimensioned according to the total booster power see type plate Connecting the control box on a voltage differ ent from the one mentioned in the description is not possible see chapter 5 2 techn...

Page 8: ...uge Turn the nut item 1 anticlockwise until there is an audible click Open the discharge valve to lower the pressure to the desired pump starting level read on pressure gauge Turn the nut item 2 antic...

Page 9: ...ed Check tightness of the valve replace it if necessary Large losses of head at suction Calculate the losses of head and make sure they are compatible with the pump NSPH Public water pressure too low...

Page 10: ...s obstructed by particles Have the pump dismantled and cleaned Voltage of the motors too low Check the voltage on motor terminals Contactor tripping too frequent starting frequency too high Required p...

Page 11: ...wilo it Kazakhstan WILO Central Asia 050002 Almaty T 7 727 312 40 10 info wilo kz Korea WILO Pumps Ltd 20 Gangseo Busan T 82 51 950 8000 wilo wilo co kr Latvia WILO Baltic SIA 1019 Riga T 371 6714 522...

Page 12: ...Pioneering for You WILO SE Nortkirchenstra e 100 D 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Reviews: