19
English
must always be installed perfectly upright on a
sufficiently heavy concrete base.
CAUTION! Risk of parts inside the pump!
Take care to remove closure members of the
pump housing before installation.
NOTE: Each pumps could be tested regarding
hydraulic features in factory, some water may
remain in them. It is recommended for hygienic
purposes, to carry out a rinsing of the pump
before any using with potable water supply.
- The installation and connection dimensions are
given § 5.2.
- Lift the pump carefully by using the integrated
hooks rings, if necessary with a hoist and suitable
slings according to the current hoist guidelines.
WARNING! Risk of fall!
Take care to pump fixations especially for the
highest pumps whose centre of gravity may lead
to risk during pump handling.
WARNING! Risk of fall!
Use integrated rings only if they are not damaged
(no corrosion ...). Replace them if needed.
WARNING! Risk of fall!
The pump must be never carried by using motor
hooks: these are only designed to lift the motor
alone.
7.3 Pipe connection
- After removing the plugs from the pump casing
and cleaning the seal faces, connect the pump to
the pipework using appropriate counterflanges,
screws, nuts, washers and seals.
CAUTION!
Tighten the nuts crosswise in steps of 20 Nm
and do not exceed 80 Nm
Use of impact wrench is prohibited.
- The circulation sense of the fluid is indicated on
the identification label of the pump.
- Pump must be installed in such a way that it is
not stressed by the pipework. The pipes must be
attached so that the pump does not bear their
weight.
- It is recommended that isolation valves be ins-
talled on the suction and discharge side of the
pump.
- Use of expansion joints may mitigate noise and
vibration of the pump.
- As regards the nominal cross-section of the suc-
tion pipe, we recommend a cross-section at least
as large as that of the pump connection.
- A check valve could be placed on the discharge
pipe in order to protect the pump against ham-
mer shock.
- For direct connection to a public drinking water
system, the suction pipe must also have a check
valve and a guard valve.
- For indirect connection via a tank, the suction
pipe must have a strainer to keep any impurities
out of the pump and a check valve.
- In case of half flanges pump design, it is recom-
mended to connect the hydraulic network and
then keep out the plastic fixation links to pre-
vent any leakage risk.
7.4 Motor connection for bareshaft pump
(without motor)
- Remove coupling guards.
NOTE: Helix pumps are equipped with captive
screws as required in the Machinery Directive.
- Install the motor on the pump by using screws
(FT lantern size – see product designation) or
bolts, nuts and handling devices (FF lantern
size – see product designation) provided with
the pump : check motor power and dimension in
WILO catalogue.
NOTE: Depending on fluid characteristics,
motor power could be modified. Contact WILO
Customer Services if needed.
- Close the coupling guards by screwing all screws
provided with the pump.
7.5 Electrical connection
WARNING! Electrical shock hazard!
Dangers caused by electrical energy must be
excluded.
•
Electrical work by a qualified electrician only!
•
All electrical connections must be performed
after the electrical supply has been switched off
and secured against unauthorized switching.
•
For safe installation and operation a proper
grounding of the pump to the power supply’s
grounding terminals is required.
- Check that operating current, voltage and fre-
quency used comply with motor plating data.
- The pump must be connected to the power sup-
ply by a solid cable equipped with a grounded
plug-connection or a main power switch.
- Three-Phase motors must be connected to an
approved motor starter. The set nominal current
must correspond to the electrical data on the
pump motor name plate
- The supply cable must be laid so that it never touches
the pipework and/or the pump and motor casing.
- The pump/installation should be grounded in
compliance with local regulations. A ground fault
interrupter can be used as extra protection.
- The connection to the network must be in
accordance with the connection plan (Fig. 5).
7.6 Operation with frequency converter
- Motors used can be connected to a frequency
converter in order to adapt pump performance to
duty point.
- The converter must not generate voltage peaks
at motor terminals higher than 850V and dU/dt
slope higher than 2500 V/µs.
- In case of higher value, an appropriate filter must
be used : contact converter manufacturer for this
filter definition and selection.
- Strictly follow instructions provided by the
Installation and operating instructions - Wilo-Helix V/FIRST 22-36-52
Summary of Contents for Helix FIRST V 22
Page 2: ...8 9 5 6 12 1 2 3 4 10 7 1 2 3 4 10 8 9 5 6 12 7 Fig 1 FIRST...
Page 3: ...Fig 2...
Page 4: ...Fig 3 Fig 6 Fig 7 Fig 5 HIGH VOLTAGE LOW VOLTAGE L1 L2 L3 W1 V2 U2 W2 U1 V1...
Page 6: ...Fig 8 Fig 9 Fig 10 x2 x4...
Page 36: ...36 WILO SE 06 2021 1 1 1 2 2 1 2 2 2 3 2 4 2 5 IEC VDE 2 6...
Page 40: ...40 WILO SE 06 2021 5 2 7 3 20 80 7 4 Helix FT FF Wilo WILO 7 5 5 7 6 850 dU dt 2500 40...
Page 42: ...42 WILO SE 06 2021 10 WILO 20 30 WILO 12 www wilo recycling com 11 WILO www wilo com...
Page 71: ...71 Wilo Helix V FIRST 22 36 52 1 1 1 2 2 1 2 2 2 3 2 4 Y VDE 2 5 IEC VDE 2 6...
Page 183: ...183 Wilo Helix V FIRST 22 36 52 1 1 1 2 2 2 1 2 2 2 3 2 4 IEC VDE 2 5 2 5 IEC VDE 2 6...
Page 190: ...1 1 1 2 2 1 2 2 2 3 2 4 2 5 IEC VDE 190 WILO SE 06 2021...
Page 191: ...191 I Wilo Helix V FIRST 22 36 52 2 6 2 7 2 8 4 3 4 4 1...
Page 195: ...195 I Wilo Helix V FIRST 22 36 52 7 3 20 80 7 4 Helix FT FF WILO Fig 2 10 Fig 9 5 2...
Page 197: ...197 I Wilo Helix V FIRST 22 36 52 3 6a 3 5a 8 2 9 15 000 Fig 7 1 2 Fig 6 10...
Page 198: ...198 10 Wilo 20 30 Wilo WILO SE 06 2021...
Page 199: ...11 Wilo www wilo com 12 www wilo recycling com 199 I Wilo Helix V FIRST 22 36 52...