14
MONTEREY TOP VENT GAS WALL HEATER
FIGURE B
FIGURE D
FIGURE C
VENT INSTALLED
FRONT PANEL INSTALLED
STUD WALL
CENTERED
14ʺ
3 - 1/2ʺ
STUD WALL
GAS STUB LOCATIONS
STUD WALL
STUD WALL
16ʺ
4 - 7/16ʺ
A
PLUMBERS
TAPE
B-W VENT PIPING
CEILING PLATE SPACER
VENT
HOLD DOWN
PLATE
HEADER
FURNACE
SIDE RAIL
BASE PLATE
PANEL
INSTALLING YOUR FURNACE