background image

www.whytetechnologies.com

www.whytetechnologies.com

10

11

Connecting the Subscriber Cables

Terminate the Subscriber Cables with good quality F Connectors and connect to the Subscriber 

Outputs. The F Connectors should be fitted to the coaxial cable correctly, ensuring that the centre 

core protrudes 3mm above the F Connector body. 

See figure 3.

 Ensure that you do not exceed the 

bending radius of the Coaxial Cable being used. The Subscriber Cables may be arranged either 

side of the Multiswitch before being terminated and connected. If required, the Subscriber Cables 

may be arranged to one side of the Multiswitch, with the cables passing under the Multiswitch before 

being terminated and connected to the Subscriber Outputs on the opposite side. 

See figure 4.

Always use CAI approved high quality coaxial cable.

Connecting the Power Supply Unit (PSU)

The PSU must be fixed to the relevant wall surface using the appropriate fixings. Connect the DC F-

type lead to the 18V DC Input of the Multiswitch.

Once  all  connections  have  been  made,  connect  the  plug  to  a  240V  socket  to  power  up  the 

Multiswitch. 

If a local mains supply is not available such as in lofts and outdoor cabinets, the Power 

Supply Unit may be conveniently fitted elsewhere whereby the 18V DC F-Type lead may be extended 

using coaxial cable.

5

Whyte

Earth Bonding

Earth bond the Multiswitch to the Earth Bonding Lug using minimum 4mm² Earth Bonding Cable.  

Make sure that the Earth Bonding Cable is connected directly to the building’s PME (Protective 

Multiple Earthing) point.

Figure 3

3mm

Figure 4

CONNECTING THE POWER SUPPLY UNIT (PSU)

Calculate the  total current consumpti on of the  Series 5 Multi switch(es), LNB 

and any Series 5 Launch Amplifi ers that make up the complete IRS System. The 

current  consumpti on  of  the  Series  5  Multi switch  range  can  be  found  in  the 

Specifi cati on secti on of this manual. If in doubt, assume the current consumpti on 

of each LNB to be 200mA max (0.2A). Connect a suitable Whyte PSU to the 

Auxiliary 18V DC Input. If more than one PSU is required, the additi onal PSU(s) 

may be connected to any other Multi switch, Launch Amplifi er, Tap or Splitt er 

within  the  system. When  all  connecti ons  have  been  made,  connect  the  PSU 

to a 240V socket to power up the IRS System. It is highly advisable to isolate 

and hence divide the system in to DC Groups containing only a single PSU per 

group, by using F-type DC blockers (not supplied).

Connecting the Subscriber Cables

Terminate the Subscriber Cables with good quality F Connectors and connect to the Subscriber 

Outputs. The F Connectors should be fitted to the coaxial cable correctly, ensuring that the centre 

core protrudes 3mm above the F Connector body. 

See figure 3.

 Ensure that you do not exceed the 

bending radius of the Coaxial Cable being used. The Subscriber Cables may be arranged either 

side of the Multiswitch before being terminated and connected. If required, the Subscriber Cables 

may be arranged to one side of the Multiswitch, with the cables passing under the Multiswitch before 

being terminated and connected to the Subscriber Outputs on the opposite side. 

See figure 4.

Always use CAI approved high quality coaxial cable.

Connecting the Power Supply Unit (PSU)

The PSU must be fixed to the relevant wall surface using the appropriate fixings. Connect the DC F-

type lead to the 18V DC Input of the Multiswitch.

Once  all  connections  have  been  made,  connect  the  plug  to  a  240V  socket  to  power  up  the 

Multiswitch. If a local mains supply is not available such as in lofts and outdoor cabinets, the Power 

Supply Unit may be conveniently fitted elsewhere whereby the 18V DC F-Type lead may be extended 

using coaxial cable.

5

Whyte

Earth Bonding

Earth bond the Multiswitch to the Earth Bonding Lug using minimum 4mm² Earth Bonding Cable.  

Make sure that the Earth Bonding Cable is connected directly to the building’s PME (Protective 

Multiple Earthing) point.

Figure 3

3mm

Figure 4

CONNECTING THE SUBSCRIBER CABLES

Terminate the Subscriber Cables with good quality F Connectors and connect to 

the Subscriber Outputs. The F Connectors should be fi tt ed to the coaxial cable 

correctly, ensuring that the centre core protrudes 3mm above the F Connector 

body. See fi gure 3. Ensure that you do not exceed the bending radius of the 

Coaxial Cable being used. The Subscriber Cables may be arranged either side 

of  the  Multi switch  before  being  terminated  and  connected.  If  required,  the 

Subscriber  Cables  may  be  arranged  to  one  side  of  the  Multi switch, with  the 

cables passing under the Multi switch before being terminated and connected to 

the Subscriber Outputs on the opposite side. See fi gure 4.

EARTH BONDING

Earth bond the Multi switch to the Earth Bonding Lug and/or the Earth Terminal 

Bars using minimum 4mm² Earth Bonding Cable. It is best practi se to earth bond 

across the Earth Bars of all components within a single IRS System using a single 

unbroken Earth Bonding Wire. To achieve this, strip away 3cm of the insulati on 

of a length of 4mm² Earth Bonding Wire. See Figure 1. 

Unscrew the Earth Bolt on the Earth Terminal Bar to provide enough clearance 

to wrap the Earth Bonding Wire around the Earth Bolt. See Figure 2. Tighten 

the Earth Bolt and route the Earth Bonding Wire to all other Earth Terminal Bars 

and  terminate  as  detailed  above.  Make  sure  that  the  Earth  Bonding  Cable  is 

connected directly to the building’s PME.

Whyte

Summary of Contents for 5 Series

Page 1: ...5 WIRE MULTISWITCH INSTRUCTION MANUAL www whytetechnologies com MODELS WM508 WM512 WM516 WM524 WM532 ...

Page 2: ...uarantee General Description Product Description Technical Description Installation Instructions Example Application Specifications 4 4 4 5 6 7 9 12 13 CONTENTS www whytetechnologies com 2 www whytetechnologies com 3 Whyte ...

Page 3: ...eter of 1mm When using larger CT125 or CT167 cables you must ensure that suitable F connectors with reducing pins are used otherwise damage to the unit will occur which will invalidate the guarantee Do not over tighten the F connectors finger tight only GUARANTEE All Whyte products are guaranteed for a period of 4 years from the date of purchase Whyte Series 5 Multiswitches are high gain universal...

Page 4: ...ltiswitches provide a gain of 10dB for SAT and 9dB for TERR All inputs come fitted with an individual Gain Control 4G 5G FILTERING The range comes fitted with high rejection 4G 5G filters that are selectable via a switch The correct filter should be selected depending on the LTE transmissions present within the installation area 5G filtering can be selected for use in 4G areas where terrestrial ch...

Page 5: ... to suit the relevant wall surface or cabinet CONNECTING THE SAT TERR INPUT CABLES Use a suitably sized Satellite Dish to provide adequate signal levels from the satellite being received Ensure that the Satellite Drop Cables are connected correctly in the corresponding order with respect to the LNB and the Multiswitch SAT inputs Quattro LNB only Ensure that the F Connectors are properly sealed aga...

Page 6: ...ted and connected If required the Subscriber Cables Multiswitch with the cables passing under the Multiswitch before the Subscriber Outputs on the opposite side See figure 4 ity coaxial cable 5 Figure 3 3mm Figure 4 CONNECTING THE SUBSCRIBER CABLES Terminate the Subscriber Cables with good quality F Connectors and connect to the Subscriber Outputs The F Connectors should be fitted to the coaxial c...

Page 7: ...www whytetechnologies com www whytetechnologies com 12 13 SPECIFICATIONS EXAMPLE APPLICATION Whyte ...

Page 8: ...www whytetechnologies com www whytetechnologies com 14 15 NOTES NOTES Whyte ...

Page 9: ...m WhyteTech WhyteTechnologies Whyte Technologies WhyteTechnologies Whyte Technologies Chevron Distribution Ltd Unit 13 Watermill Business Centre Edison Road Enfield EN3 7XF Phone 0330 999 1980 E mail info whytetechnologies com ...

Reviews: