INSTALLATION
INSTALLING OPTIMA 3 INS (CONTINUED)
IMPORTANT- Make sure the chimney and firebox are clean and free of soot and ashes before installation begins. Fail-
ure to do so may result in the transfer of soot into the room by way of the room air blower. Do not block opening at front
of insert (below door).
♦
USA & Canada – Requires an approved noncombustible hearth or floor protector, 3/8” / (10 mm) millboard
or equivalent (k = .84, r = 1.19) to extend 6” / 150 mm to the front of the glass door.
PAGE 21
Full Chimney Reline
(Recommended for ALL chimney installations)
VENT TERMINATION WHEN LINER IS USED.
A section of pellet vent pipe is required at the top where
exposed to the elements (see illustration below).
Horizontal Vent (Direct Vent)
U.S.A. – The insert may
be installed as a Direct
Vent (horizontal vent
through the chimney
structure) in masonry
fireplaces if local codes
will permit.
Canada – Installing an
insert a s a Direct-Vent
is not allowed. The fire-
place chimney must be
fully relined from the
insert outlet to termina-
tion.
Listed Pellet Vent Cap
1' Section of
PL Vent
3" or 4" liner
(listed to UL 1777
or ULC S635)
Chase Cover
IN CANADA – Installing as a Horizontal Vent
is not allowed. The fireplace chimney must
be fully lined.
Approved Liner for Fac-
tory Built (ZC) Fireplaces
and Masonry Fireplaces
is 2100HT (degree F.)
liner listed to UL 1777 or
ULC S635.
Clean Out
Tee
Positive Flue
Connection
Recommended
Summary of Contents for Advantage Optima 2 FS
Page 38: ...WIRING DIAGRAM PAGE 38 ...
Page 44: ...REPLACEMENT PARTS DIAGRAMS PAGE 44 5 6 8 10 13 14 9 12 7 11 ...
Page 45: ...REPLACEMENT PARTS DIAGRAMS PAGE 45 15 16 17 19 20 22 24 25 26 27 18 23 ...
Page 46: ...REPLACEMENT PARTS DIAGRAMS PAGE 46 30 37 38 40 41 29 28 33 34 39 31 32 35 ...
Page 47: ...REPLACEMENT PARTS DIAGRAMS PAGE 47 43 44 45 46 47 42 ...
Page 49: ...INSTALLATION TIPS PAGE 49 ...