WHITEHALL MANUFACTURING
• P.O. BOX 3527 • City of Industry, CA 91744-0527 U.S.A
Phone (800) 782-7706 • (626) 968-6681 • Fax (626) 855-4862 • Web: www.whitehallmfg.com
INSTALLATION, OPERATION & MAINTENANCE MANUAL WH3778
6
NOTE: Installation should be in accordance with accepted construction practices.
5) Install and secure Upper 1/2”-13 UNC Mounting Studs
5
to Horizontal Support Plate
1
with provided Nuts and
Washers
9
. See Section A-A.
1) Assemble Horizontal Support Plate
1
to Support Knuckles
2
using 1/4”-20 Set Screws
3
provided, to obtain
proper vertical spacing of Vertical Supports
4
.
6) Secure 1/2”-13 Mounting Studs
5
to Support Knuckles
2
with Nuts and Washers
8
provided.
3) Slide Horizontal Support Assembly onto Vertical Supports
4
so that upper mounting points
5
are at desired
location, see chart, and secure with 1/4”-20 Set Screws
3
and position carrier in desired location.
2) Slide each set of Support Knuckles
2
onto Vertical Supports
4
and position so that 1/2”-13 mounting points are at
dimensions shown and secure with 1/4”-20 Set Screws
3
.
4) Using Support Bases
6
as a template mark an locate floor mounting points. Move carrier and install Floor
Anchors
7
provided by installer. Reposition carrier and secure to floor using installer provided anchoring
hardware
7
.
DIMENSION "A"
ADA
ADA -JH
OBC
31"
28"
31"
2
3
4
6
FINISHED
7
2
WALL
5
5
8
1
3
Carrier Assembly Installation:
4"
"A"
9"
4"
SQ.
2
3
4"
2
3
4"
Ø5
8
"
SUPPORT BASE
DETAIL SCALED x2
SECTION A-A
DETAIL SCALED x1.5
4 3
4
"
MAX.
2" MIN.
1
5
131
4"
A
A
OPTIONAL -MC MOUNTING CARRIER
ASSEMBLY INSTALLATION