•
Setting up the downhaul, run the down hall rope thought the blocks at the bottom of
the mast (1)
•
Run the downhaul rope back a forth though the pulleys and out of the opposite block
attached to the mast (2)
•
Run the downhaul rope thought the front eye in the trampoline (3)
•
Connect the rope to the bungee underneath the trampoline (4)
•
Tie the bungee to the shackles at on the back corners underneath the rear beam (5)
Downhaul
12
1
2
3
4
5