![Wheelock SAFEPATH RSAPE-B Operation And Installation Manual Download Page 14](http://html1.mh-extra.com/html/wheelock/safepath-rsape-b/safepath-rsape-b_operation-and-installation-manual_968388014.webp)
Remote
SAFEPATH
Manual Sheet
14
of
50
Rev. C December 1998
Installation
WARNING:
SHUT OFF ALL POWER BEFORE STARTING THE INSTALLATION. ELECTRICAL SHOCK CAN CAUSE
DEATH OR SERIOUS INJURY.
CAUTION:
This panel’s printed circuit boards are sensitive to static electricity and have delicate components mounted on
them. Before handling either a board or any component on a board, discharge any static electricity from your
body by touching a grounded object such as a metal screw which is connected to earth ground. Handle the
board by its edges, and be careful not to twist or flex it. This panel is to be installed in a static free area and the
user is to properly attach grounded wrist straps before touching any static sensitive areas. After handling this
panel’s printed circuit boards, the panel should be tested in accordance with the “System Checkout” guidelines
in the “Installation” section of this manual to verify that the printed circuit boards are undamaged and functioning
properly.
CAUTION:
The Authorities Having Jurisdiction (AHJ) should be consulted by the installer prior to installation.
1.
Prepare a drawing of the complete system wiring (Keep a copy of the system wiring drawing with this manual as a
permanent record of the system wiring). See the "Wiring Guidelines" and the "Field Wiring" sections to help develop
this drawing.
2. Carefully unpack the panel and make sure each item described on the packing slip is present and undamaged.
3. Mount the panel in the desired location as described in the "Mounting" section.
4. Mount any additional wiring boxes or junction boxes needed to interconnect field wiring.
5. Connect conduit fittings or bushings as needed using knockouts provided on the top and bottom of the panel.
6. Install field wiring in conduit when necessary, following the National Electrical Code and local codes for the type of
system being installed. Make all necessary connections at any additional wiring or junction boxes.
CAUTION:
Provide proper strain relief for all wiring not in conduit.
7. Connect the panel to earth ground, following the National Electrical Code and local codes for the type of system being
installed, as described in the “Grounding “ section.
8. Check the integrity of all field wiring following the directions in the "Field Wiring Checkout'' section. Confirm that the
specified cable is installed and that there is continuity between required points (no open circuits), with no unwanted
connections (shorts) to other conductors, chassis, or earth ground.
9. Connect the wiring to the appropriate terminals of the panel’s modules following the directions in the "Field Wiring"
section and the system wiring drawing created in Step 1.
10. Install the appropriate amplifier modules into slots 1 thru 4 of the mother board.
11. Configure the dip switches on the controller module and install into slot 5 of the mother board.
12. Apply power and perform the operational tests described in the "System Checkout" section.
The lives of people depend upon your safe installation of this panel. Please read, understand and carefully follow the specific
installation instructions set forth below to avoid damage to this panel and the equipment connected to it. Installation should be
conducted only by qualified persons in accordance with the procedures in this manual.
Summary of Contents for SAFEPATH RSAPE-B
Page 11: ...Remote SAFEPATH Manual Sheet 11 of 50 Rev C December 1998 Figure 2 Operator s Console ...
Page 16: ...Remote SAFEPATH Manual Sheet 16 of 50 Rev C December 1998 Figure 3 Panel Mounting ...
Page 41: ...Remote SAFEPATH Manual Sheet 41 of 50 Rev C December 1998 Figure 23 Panel Block Diagram ...