8
Manual Roll Groove Operation
Part 3
Repeat Steps 6 and 7 until the depth adjust screw
touches the top plate. At this point the roll groove is
complete.
Roll groove complete.
Turn feed screw counterclockwise to release roller
from groove. Make sure that the roller is high
enough to clear the dimple on the inside of the pipe.
Remove roll groove tool from pipe.
Measure groove with a diameter tape upon
completion.
8
9
10
11