25
WHL-032 REV. 6.2.16
2. Direct Vent, Optional Horizontal and Vertical Vent Kits
Figure 10
– Direct Vent, Vent Terminations (With Optional Kits)
All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.